Find or Sell any Parts for Your Vehicle in USA

Reman Compressor & Clutch Four Seasons 97495 on 2040-parts.com

US $348.83
Location:

Erlanger, Kentucky, United States

Erlanger, Kentucky, United States
Condition:New: A brand-new, unused, unopened, undamaged item in its original packaging (where packaging is applicable). Packaging should be the same as what is found in a retail store, unless the item was packaged by the manufacturer in non-retail packaging, such as an unprinted box or plastic bag. See the seller's listing for full details. See all condition definitions Manufacturer Warranty:Lifetime core charge:$ 50 Which is included in the total price Mfr Code:120 Brand:Four Seasons Manufacturer Part Number:97495

A/C Compressor & Clutch for Sale

Pebble Beach: A weekend of paradise for car guys

Fri, 14 Aug 2009

Just once before you die (or every year until you die, your choice), you have to go to Monterey for the Big Car Weekend. If you've never been, no words can suffice. If you have been, you don't need any words, and you've packed the Packard and are ready to hit the highway.

Hottest 911 ever!

Wed, 05 May 2010

A few weeks back, we revealed spy shots of the next-gen Porsche 911 GT2. But now the Web is awash in reports from a Porsche dealer meeting in Germany where the company revealed the even-hotter GT2 RS. Reportedly pushing 620 hp from its turbocharged boxer-six engine, the track- and street-legal GT2 RS is said to be 200 pounds lighter than the GT2.

SAE approves new fast-charging standard for EVs, plug-ins

Tue, 16 Oct 2012

SAE International said it has approved a new technical standard that will dramatically reduce charging times for plug-in hybrid electric vehicles and electric vehicles. The global engineering group said the new charging standard, developed with the cooperation of more than 190 automakers, utilities and equipment builders, will allow charging times to be reduced from as long as eight hours to as short as 20 minutes. Automakers want DC direct charging to take less than 10 minutes, or roughly the time it takes to fill a tank with gasoline.The goal is to accommodate currents as high as 500 volts distributed from public charging stations.