Replace Mb2502127 - 98-99 Mercedes Slk Class Front Lh Headlight Assembly Halogen on 2040-parts.com
Tampa, Florida, US
Headlights for Sale
- Replace sc2519101v - 04-06 scion xb front rh headlight lens housing(US $90.72)
- Replace sc2519104c - 2010 scion tc front rh headlight lens housing(US $207.83)
- Replace ni2502114v - nissan altima front lh headlight assembly combo assembly(US $151.86)
- 2005-2009 ford mustang park signal side marker lamp amber len&hsg w/o bulbs left(US $25.25)
- 08-12 mercedes benz c300 c350 c63 hid xenon headlight excellent right w204(US $539.00)
- 06 dodge ram pickup truck chrome head lights w amber reflector passenger(US $69.74)
Tesla London opens
Fri, 26 Jun 2009Tesla has opened a Flagship Showroom in London's Kensington Located in Cheval Place in Kensington, which is round the corner from Harrods and with easy access to Heathrow (depending on the time of day and the traffic!), the new Tesla Showroom will be supplemented by Sales & Service Centres in Monaco, Munich and Zurich. The first Tesla Roadsters are due to be delivered to the UK this Summer – all of which will be the Tesla Roadster Signature Edition. However, if you don’t need to be an early adopter, you will be able to take delivery of a RHD Tesla Roadster from 2010.
Hemi Coronet, Triumph 2000 and Bentley top sales at Novi auction
Thu, 02 May 2013A 1965 Dodge Coronet 500 Hemi convertible was the top seller at the second annual Novi Metro Detroit Spring Classic Car Auction on April 27. It crossed the block, which was commandeered by Hagerty. A 1940 Ford V8 Deluxe convertible was second, selling for $37,800.
GM to double size of battery lab
Mon, 12 Apr 2010General Motors says it will spend $8 million to double the size of its Global Battery Systems Lab, which the company claims is the largest and most technologically advanced automotive battery lab in the United States. GM says the expansion will speed up the development of hybrid and electric vehicles, such as the upcoming Chevrolet Volt, by improving on-site testing of battery cells and systems. When finished, the lab will be 30,000 square feet bigger than it is now, for a 63,000-square-foot total.