Find or Sell any Parts for Your Vehicle in USA

Rewind Recoil Starter # 3083548 Polaris 1988 Trail 440 Snowmobile on 2040-parts.com

US $40.69
Location:

Clarissa, Minnesota, United States

Clarissa, Minnesota, United States
Condition:Used: An item that has been used previously. The item may have some signs of cosmetic wear, but is fully operational and functions as intended. This item may be a floor model or store return that has been used. See the seller’s listing for full details and description of any imperfections. See all condition definitions Brand:Polaris Warranty:No Manufacturer Part Number:3083548

Starters for Sale

Fancy driving Hyundai’s Hydrogen ix35 Fuel Cell?

Fri, 05 Oct 2012

As part of the European Hydrogen Road Tour, Hyundai are offering members of the public the chance to drive the ix35 FCEV. As we revealed back in August, the Hyundai ix35 FCEV – Hyundai’s hydrogen-powered electric ix35 – is going in to production before the end of 2012, the first proper production fuel cell vehicle…in the world. The initial production run is small – just 1,000 cars – but Hyundai are planning to put the ix35 FCEV in to full production by 2015, by which time they’re hoping there will be a viable hydrogen refuelling infrastructure in place.

Hydrogen cars to storm London

Fri, 04 Apr 2014

A CONSORTIUM of car makers, infrastructure suppliers and energy consultancies has signed an exciting new agreement to turn hydrogen-powered cars into an everyday reality. The pioneering deal, dubiously named the HyFIVE project (Hydrogen For Innovative Vehicles), is the largest of its kind in Europe. The five manufacturers have agreed to deploy a total of 110 hydrogen fuel cell vehicles at several European locations and develop new clusters of hydrogen refuelling stations – and London is high on the list of targets.

Repair work to hit key road route

Tue, 24 Sep 2013

A KEY ROAD ROUTE into London will be affected by closures at some weekends next summer for the completion of repair work. The summer 2014 work will be on the Hammersmith Flyover on the A4 in west London. Before that, there will be night-time lane closures starting next month as the final phase of work to strengthen the flyover's 16 spans begins.