Find or Sell any Parts for Your Vehicle in USA

Rite Line Spark Plugs Vintage Nos - Box Of 8 - Various Numbers Available on 2040-parts.com

US $25.00
Location:

Coopersburg, Pennsylvania, US

Coopersburg, Pennsylvania, US
Returns Accepted:Returns Accepted Item must be returned within:14 Days Refund will be given as:Money back or exchange (buyer's choice) Return shipping will be paid by:Buyer Return policy details:Money back on unused with new packaging or exchange for different number. Shipping by buyer. Restocking Fee:No Brand:Rite Line Manufacturer Part Number:R8 8 Warranty:No

 8 new spark plugs type R8 8.  I have many more numbers available.  Message with number needed.

Citroen Tubik concept car (2011) first pictures

Mon, 05 Sep 2011

The Citroen Tubik may have overtones of a guppy fish, but this new nine-seat MPV concept car shows how the French envisage a people carrier of tomorrow. It draws inspiration from the Type H or TUB (French slang for a front-wheel drive commercial vehicle) van from Citroen's history books. So it's a spacious monobox and aims to solve the usual MPV dilemma or seats or baggage, by being simply massive.

2009 Mercedes McLaren SLR Stirling Moss

Fri, 19 Dec 2008

The spectacular Mercedes Benz McLaren SLR Stirling Moss This will certainly brighten up the Detroit Motor Show! After months of speculation, Mercedes McLaren has announced to the world that the spectacular Mercedes Benz McLaren SLR Stirling Moss will be unveiled at the Detroit Motor Show in the New Year. The Mercedes / McLaren collaboration has now come to an end, and the SLR Stirling Moss is the fanfare.

BID TO SLOW TRAFFIC ON M3 STRETCH

Fri, 14 Feb 2014

FIRST it was a stretch of the M1 and now the same speed reduction plan has been announced for a stretch of the M3 motorway in Surrey and Hampshire. The Highways Agency (HA) has proposed that a three-mile section of the M3 between junction 3 at Lightwater in Surrey and junction 4 near Farnborough in Hampshire be subject to a 60mph restriction. This section is part of a 13.4-mile stretch that is being upgraded in a £174 million scheme, with the 60mph proposal, to operate between 7am and 7pm daily so air quality levels can be met.