Rock Products Era405 Rocker Arm-engine Rocker Arm on 2040-parts.com
Chino Hills, California, US
Rocker Arms & Parts for Sale
- Rock products eras408 rocker arm shaft-engine rocker arm shaft(US $47.58)
- Caterpillar c15 acert actuator / rocker shaft hold down studs updated style 3pak(US $64.00)
- Dnj engine components era405 exhaust rocker arm(US $21.62)
- Dnj engine components era607a exhaust rocker arm(US $36.11)
- Dnj engine components ira405 intake rocker arm(US $21.64)
- 1987 factory ford mustang rocker arms & rocker channels(US $25.00)
Cadillac issues XTS recall over fire risk
Fri, 21 Mar 2014Cadillac is recalling approximately 63,900 XTS sedans over an issue with the brake booster pump. The company believes that the brake booster pump can create positive pressure inside the wiring harness which is attached to the pump relay, and this pressure can dislodge a cavity plug in the relay and allow corrosive elements to enter the connector, creating a resistive short. Cadillac believes that this could lead to overheating and melting of plastic components, and may cause a fire in the engine compartment.
Land Rover cuts short Christmas break to cope with demand
Sat, 31 Dec 2011Land Rover workforce back early from Christmas After a boom year for sales at Land Rover, workers have been brought back from their Christmas New Year break early to cope with demand. 2011 has been a remarkable year for Land Rover. Perhaps the greatest achievement is to take the underpinnings of the Freelander 2 – a good car, but not the top of the list for fashion-conscious buyers – and turn it in to the style icon that is the Range Rover Evoque.
Camaro plant gets more work; recall issued
Thu, 07 May 2009The strong early demand for the Chevrolet Camaro has General Motors looking to crank more units out of the Oshawa, Ontario, assembly plant. The Oshawa plant was exempt from GM's recent announcement of shutdowns of as long as nine weeks for several of its plants--primarily those that build pickups and SUVs. Oshawa will increase Camaro output by adding overtime and an extra week to the plant's production schedule.