Rule-a Matic Boat Bilge Pump Switch Model 35 on 2040-parts.com
Rockledge, Florida, United States
New uninstalled/unused. Open package.
|
Plumbing & Ventilation for Sale
- Jabsco pump repait kit 30126-0000 itt service kit 36950 series pumps(US $74.95)
- Marine/boat rule 1500 manual bilge pump with rule super switch
- Larson boats 2144-9407 shurflo 3901-2204q blaster marine washdown pump(US $131.95)
- Apollo 2 1/2" bronze thru-hull fitting 65-bn7-55(US $65.00)
- 3/4" flanged bronze seacock apollo by conbraco(US $69.00)
- Groco bronze 3/4" thru-hull less nut fittings part # th-750-l(US $32.00)
College Exhibition: Coventry University MA Degree Show 2009
Wed, 23 Dec 2009MA students from Coventry University's School of Art and Design presented their annual degree show at Coventry Transport Museum late last month. Entitled ‘Keep Movin', the nine graduating students showed a range of projects, which centered on the theme of sustainable transportation, energy efficient vehicles and new materials. There was also a sample of an earlier group project that explored the future of the car based on the ‘Foresight Future Scenarios 2055'.
Jaguar Land Rover boss dies (2008)
Mon, 21 Apr 2008Geoff Polites, Jaguar Land Rover CEO: 1948-2008 By Gavin Green Motor Industry 21 April 2008 06:53 Geoff Polites, who died yesterday aged 60, will go down as one of the great British car industry bosses. He took over as CEO of Jaguar Land Rover in September 2005, when the Jaguar half of the business was at its lowest ebb. Sales of the lame duck X- and S-types were fast evaporating; Jaguar was consistently failing to hit its financial forecasts; morale was poor.
Camaro plant gets more work; recall issued
Thu, 07 May 2009The strong early demand for the Chevrolet Camaro has General Motors looking to crank more units out of the Oshawa, Ontario, assembly plant. The Oshawa plant was exempt from GM's recent announcement of shutdowns of as long as nine weeks for several of its plants--primarily those that build pickups and SUVs. Oshawa will increase Camaro output by adding overtime and an extra week to the plant's production schedule.