Find or Sell any Parts for Your Vehicle in USA

Rv Cargo Door R.o. 26" Tall X 18" Wide X 3/4" Thick Rough White/black Trim on 2040-parts.com

US $9.99
Location:

Bronson, Michigan, US

Bronson, Michigan, US
Returns Accepted:Returns Accepted Item must be returned within:14 Days Refund will be given as:Money Back Return policy details:The buyer has 7 days to return the item (the buyer pays shipping fees). The item will be refunded. Return shipping will be paid by:Buyer Restocking Fee:No Warranty:No

 RV CARGO DOOR HAS KEY LATCH TOP AND KEY LOCK BOTTOM WITH KEY

COLOR: ROUGH WHITE WITH BLACK TRIM

MEASUREMENTS: ROUGH OPENING 26" TALL X 18" WIDE X 3/4" THICK FULL OPENING: 27 1/2" TALL X 19 1/2" WIDE

THIS IS USED HAS A FEW MINOR SCRATCHES THROUGHOUT DUE TO STORAGE.

Opel design boss dismissed

Mon, 30 Jul 2012

Newly appointed Opel design boss Dave Lyon has been dismissed by parent company General Motors, less than a week before he was set to take over the position at the company's troubled European subsidiary in Russelsheim, Germany. Lyon, who was set to receive Opel's design operations from current boss Mark Adams on Aug. 1, was reportedly escorted from GM design headquarters in Michigan late last week under mysterious circumstances.

Ford C-Max and Mondeo spotted in Detroit

Mon, 26 Mar 2012

Detroiter Spencer Abbott spotted a couple of Euro Fords out cruising the boulevards of suburban Detroit this weekend. Like a good Autoweek reader, he snapped a few photos as soon as it could be done safely. The C-Max can be easily explained, as Ford plans to start selling the little people mover stateside this fall.

KISKA opens new design studio

Thu, 19 Mar 2009

Austrian brand management and design company KISKA has moved its design studio into a modern new building in Salzburg, Austria, just a few meters from its former location. The new headquarters boasts state-of-the-art workstations and has been built to enable the firm to prepare for expansion and new challenges in the years to come. Designed by Hofbauer architects, the 4700m² building was built in just one and a half years.