Find or Sell any Parts for Your Vehicle in USA

Rv Fuel Tank, 18 Gallons, Gas Or Diesel Tank, Metal New on 2040-parts.com

US $225.00
Location:

Adrian, Michigan, US

Adrian, Michigan, US
Returns Accepted:Returns Accepted Item must be returned within:14 Days Refund will be given as:Money Back Return policy details: Return shipping will be paid by:Buyer Restocking Fee:No

You are viewing a New Fuel Tank for an RV or ?

  • Metal Fuel Tank for RV or ?
  • Brand new, never had fuel in them
  • 60" Long, 13" Wide, and 6" Deep.
  • According to the tag, they are 18 gallon tanks
  • 1 - 1/2" Openings on Top
  • 1 - 1 1/2" Opening on top
  • In other words, 1 fill, 1 vent, 1 sending unit
  • Please contact me with any questions
  • You can email or call at 517 265-8735
  • See my Ebay Store for other sizes

Other for Sale

New Audi e-Tron at Detroit – the ‘Compact’ e-Tron

Mon, 11 Jan 2010

Audi has revealed a compact version of the e-Tron at the Detroit Motor Show Audi brought along the first Audi e-Tron to the Frankfurt Motor Show in September. Looking like an electric version of the Audi R8, it managed to steal some of the thunder from BMW’s Vision ED concept . Most notable was the stratospheric torque figures Audi quoted, which ultimately turned out to be somewhat disingenuous.

New Range Rover Sport in New York

Wed, 08 Apr 2009

The newly refreshed Range Rover Sport takes at bow at the New York Motor Show Land Rover are working hard to keep their main models up to date and fresh before an all new set of cars arrives in a couple of years. And the big news with the Range Rover Sport is really under the skin. Out goes the old supercharged 4.2 and the somewhat breathless 2.7 diesel, and in comes the brute of a 5.0 litre supercharged lump from Jaguar that has also gone in to the new Range Rover (and the LR4 – but not for the UK – why not?), and the terrific 3.0 litre diesel that also graces the Jaguar.

Detroit Electric delays SP:01 EV

Mon, 03 Jun 2013

Detroit Electric will delay the SP:01 EV roadster for at least a month, according to a company executive who talked to the Detroit News. The company still hasn’t finalized a manufacturing location in Wayne County. Production was scheduled to start in August, now it’s slated for September.