Scorpio Alarm Factory Connector Kit For Harley Davidson Xl Sportster 2004-2009 on 2040-parts.com
Holland, Michigan, US
Electrical Components for Sale
- Joker machine jx throttle housing dual thread-in cable black anodized h-d all(US $78.58)
- 08 09 10 11 12 ninja 250 ex250 ex-250 main engine wiring wire harness loom(US $55.00)
- Harley davidson regulator touring new take off 74505-09 streetglide(US $19.99)
- Geniune harley starter solenoid 65-88 fits many models (US $40.00)
- 05 suzuki sv650 starter switch(US $59.99)
- Suzuki bandit ignition coils, wires(US $10.00)
2016 Ford Focus RS hits the Nurburgring (video)
Tue, 26 Aug 20142016 Ford Focus RS hits the Nurburgring One car Ford has failed to produce in the latest Focus is the Focus RS, but that is set to change with plans for a new range-topping Focus RS hitting Ford’s showrooms in 2016, a year before the current Focus is due for an update. So it’s no surprise to see Ford starting to blat the new Focus RS round the Nurburgring – albeit using a Focus ST as a mule for the RS’s powertrain – ahead of a probable reveal late in 2015. Almost certainly powering the new Focus RS is the 2.3 litre EcoBoost from the new Ford Mustang, which gets 304bhp in the Mustang but which is expected to get as much as 345bhp in the new RS – as much as the old Focus RS500 managed.
Chrysler cuts Viper output amid slow sales, growing inventory
Thu, 03 Oct 2013Chrysler Group has cut output of the SRT Viper by a third and will reassign scores of workers to other plants because of slow sales, growing inventories, and the onset of colder weather. Workers at Chrysler's Conner Avenue Assembly plant in Detroit, where the car is assembled, were told of the production moves today. None will be laid off; instead they will be reassigned to other Chrysler plants in the Detroit area, a Chrysler spokeswoman said.
M4 junction to close over tailbacks
Wed, 19 Mar 2014A JUNCTION of the M4 motorway in south Wales will be closed as part of a trial to cut traffic tailbacks. The closure of junction 41 at Port Talbot starts this summer and aims to reduce congestion in both directions. Wales' Economy and Transport Minister Edwina Hart said studies predicted it would increase the capacity of the M4 by 11% westbound and 2% eastbound.