Sidi Vortice Air Racing Motorcycle Boots White Black Size Eu 47 Us 12-12.5 on 2040-parts.com
South Houston, Texas, US
Boots for Sale
- Sidi st black/white racing motorcycle boots eur 47 us 12-12.5(US $395.00)
- Sidi new york street motorcycle boot black size eu 47(US $100.00)
- Sidi blade black motorcycle boots size eur 50 us 14.5(US $200.00)
- Sidi crossfire 2 ta off road motocross boot black size us 7.5 eu 41(US $525.00)
- Sidi st black/red racing motorcycle boots size eur 43 us 9-9.5(US $395.00)
- Sidi on road gore-tex touring boots black eur 39 us 6(US $360.00)
Dodge Dart (2013) unveiled early
Sat, 07 Jan 2012Dodge Dart (2013) revealed early The US take on the Alfa Giulietta, the 2013 Dodge Dart, has been revealed early after photos leaked out ahead of a debut at the Detroit Auto Show. The Dodge Dart has been teased in bits by Chrysler ahead of a debut at the Detroit Auto Show next week, but the interwebs have lost patience with the new Dodge tease and have jumped the gun, revealing the Dart in all its glory. And actually, it’s not a bad looking effort.
Peugeot 208 GTi arrives
Fri, 17 Feb 2012Peugeot finally recreates the 205 GTi - the Peugeot 208 GTi arrives at Geneva The Peugeot 208 GTi Concept has been revealed, powered by the 197bhp 1.6 litre turbo from the RCZ. Debuts at Geneva 2012. Yesterday we had what we were convinced was a tease for the Peuegot 208 GTi, and we were right.
Call for reform over road repair funding
Fri, 06 Jun 2014FUNDING patterns mean most road maintenance is being carried out in "less-efficient, cold and wet" times, a report from a Government spending watchdog has said. The current pattern of funding, combined with the need to spend money within the financial year, means that most maintenance work goes on between September and March, said the report from the National Audit Office (NAO). It went on: "Although this is less disruptive for road users, it is less efficient than carrying out the work at other times of year because materials can be more difficult to handle in cold and wet conditions, and daylight hours are shorter." The report went on: "As a result of the additional funding for emergency repairs, which is made available at the end of the financial year, almost all highways authorities need extra capacity from the market at the same time, which makes it less likely that they will get value for money." The NAO report said there was a "lack of predictability" over road spending adding that historically, local highway authorities spent more revenue on maintenance, but were now carrying out fewer routine activities such as clearing gullies which are essential to preventing water seeping into roads' sub-structure.