Ski-doo Machz Renegade Rt 1000 Engine Head on 2040-parts.com
Duvall, Washington, US
Engine head for Ski-Doo 1000. 1 dome shows some detonation as shown in pictures. Will work on any Ski-Doo 1000 from 2005 - 2007 including RT, MachZ, Renegade.
Snowmobile Engine Components for Sale
- 2006 polaris fusion 900 engine motor brand new 4 injector fusion 900 engine(US $1,695.00)
- New wiseco rupp piston kit # 2177p1 .010" os 57mm fits 292cc tr295 right(US $55.95)
- Polaris iq 600 cfi engine complete motor 4 injector 2012 iq snowmobile brand new(US $2,695.00)
- Ski-doo part number 529-035-829 machz renegade rt1000 engine lift tool(US $53.00)
- Wiseco top end piston kit polaris liberty motor/500 indy more model 1999 to 2007(US $170.00)
- Polaris iq 800 jackshaft drive shaft(US $40.00)
'Concrete glimpse' of near-future Audi technology
Mon, 13 Jan 2014THE “near future” of Audi design and powertrain engineering has been unveiled ahead of the North American International Auto Show (NAIAS) in Detroit. The Allroad Shooting Brake show car will premiere an exciting new high-powered petrol-electric plug-in hybrid drivetrain and a development of the firm’s current design language. It is expected that the Allroad Shooting Brake will form the basis for future Q-badged models as well as a potentially expended Allroad range.
Mustang logo inspired by football game?
Fri, 25 Oct 2013Did inspiration strike Lee Iacocca during a football game at the University of Michigan 50 years ago? At the time, Iacocca was a vice president with Ford Motor Co., which was preparing to roll out a new sports car the following spring. On Sept.
Camaro plant gets more work; recall issued
Thu, 07 May 2009The strong early demand for the Chevrolet Camaro has General Motors looking to crank more units out of the Oshawa, Ontario, assembly plant. The Oshawa plant was exempt from GM's recent announcement of shutdowns of as long as nine weeks for several of its plants--primarily those that build pickups and SUVs. Oshawa will increase Camaro output by adding overtime and an extra week to the plant's production schedule.