Find or Sell any Parts for Your Vehicle in USA

Smiths Tachometer 80 Mm Fitment 8000 Rpm M12x1 Thread Replica - Fast Shipping on 2040-parts.com

US $35.00
Location:

DELHI, DELHI, India

DELHI, DELHI, India
Condition:New Manufacturer Part Number:SPEEDOA1 Brand:After Market

  Tachometer
replica Smiths
Dimension Details:
Bezel = 3 1/4 " (85 mm)
Body = 3 1/8  " (80 mm)

Thread Size for cable  = M12 X 1 
with mounting bracket and 12 v bulbs for illuminaion.

should fit many vintage Triumphs BSA Norton Matchless Bikes
(confirm fitment at your end before buying)

2012 Dodge Viper concept shown to dealers looks like an Alfa

Thu, 16 Sep 2010

The 2012 Dodge Viper concept resembled the Alfa Romeo 8C Competizione with a Viper face, a source said. The Competizione is a limited-edition supercar that was sold in select Maserati dealerships in North America. In 2009 Alfa Romeo brought 84 coupes and 35 Spiders to the United States for sale in seven Maserati dealerships.

Porsche 911 50 Years Edition stars at the 2013 Frankfurt Motor Show

Tue, 10 Sep 2013

The Porsche 911 is 50 years old this year – just in case you missed the memo – and the 2013 Frankfurt Motor Show represents the final culmination of the celebrations. The 911 was originally launched at this very event, way back in 1963. At the 2013 Frankfurt IAA, Porsche is paying homage to its home-grown hero with a new 911 50 Years Edition, based on the latest 991-series Carrera S.

Call for reform over road repair funding

Fri, 06 Jun 2014

FUNDING patterns mean most road maintenance is being carried out in "less-efficient, cold and wet" times, a report from a Government spending watchdog has said. The current pattern of funding, combined with the need to spend money within the financial year, means that most maintenance work goes on between September and March, said the report from the National Audit Office (NAO). It went on: "Although this is less disruptive for road users, it is less efficient than carrying out the work at other times of year because materials can be more difficult to handle in cold and wet conditions, and daylight hours are shorter." The report went on: "As a result of the additional funding for emergency repairs, which is made available at the end of the financial year, almost all highways authorities need extra capacity from the market at the same time, which makes it less likely that they will get value for money." The NAO report said there was a "lack of predictability" over road spending adding that historically, local highway authorities spent more revenue on maintenance, but were now carrying out fewer routine activities such as clearing gullies which are essential to preventing water seeping into roads' sub-structure.