Find or Sell any Parts for Your Vehicle in USA

Smp/standard Cp3189 Vapor Canister-fuel Vapor Canister on 2040-parts.com

US $188.66
Location:

Nanuet, New York, US

Nanuet, New York, US
Returns Accepted:Returns Accepted Refund will be given as:Money Back Item must be returned within:14 Days Return policy details:All returns must be new in box. No returns on electrical items. Please message us with any concerns or possible defective parts so we may help you troubleshoot before sending the item back. Return shipping will be paid by:Buyer Restocking Fee:No Part Brand:SMP/STANDARD Manufacturer Part Number:CP3189 SME:_3470 UPC:00025623390246 Interchange Part Number:GENERAL MOTORS OE 15130739 Country of Origin (Primary):US Harmonized Tariff Code (HTS):8421398090 Life Cycle Status Code:2 AAIA Part Type Description:3216 Product Description - Short - 20:VALVE - CAN. VAPOR Product Description - Long - 80:VAPOR CANISTER

Mercedes-Benz Concept S-class coupe bows at Frankfurt motor show

Tue, 10 Sep 2013

Mercedes-Benz previewed its upcoming S-class coupe at the Frankfurt auto show, revealing this lightly veiled concept car. Set to replace the 7-year-old CL, the muscular-looking two-door teases the production model, planned to be rolled out at the Detroit auto show in January. U.S.

BMW i8 (2013) at Frankfurt motor show

Tue, 10 Sep 2013

This is the new BMW i8, unveiled this morning at the 2013 Frankfurt motor show. It’s BMW second ‘i’ model (after the i3 city car) and thanks to lightweight carbonfibre construction and a new downsized turbocharged engine, the new i8 is a sports car that offers the performance of an M3 and over 100mpg. The supercar of the future?

Nissan UK Battery plans confirmed

Mon, 20 Jul 2009

Nissan - the Renault Nissan Alliance - has confirmed plans for car battery production in the UK and Portugal The aim of the battery production plants is to supply batteries for electric cars built by the Renault Nissan alliance, but Nissan haven’t actually said that they will build any electric cars in the UK. Hmm. The target production is 60,000 annually to be used in a range of Nissan and Renault electric cars that will start to hit the market next year (2010) – in the US and Japan – with full global roll-out by 2010.