Find or Sell any Parts for Your Vehicle in USA

Smp/standard Ds-917 Switch, Miscellaneous-power Door Lock Switch on 2040-parts.com

US $37.31
Location:

Upland, California, US

Upland, California, US
Returns Accepted:Returns Accepted Refund will be given as:Money Back Item must be returned within:14 Days Return shipping will be paid by:Buyer Restocking Fee:No Part Brand:SMP/STANDARD Manufacturer Part Number:DS-917 SME:_3354 UPC:00091769378639 Interchange Part Number:GENERAL MOTORS OE 20043224 Country of Origin (Primary):TW Harmonized Tariff Code (HTS):8536509065 Life Cycle Status Code:2 Product Description - Long - 80:POWER DOOR LOCK SWITCH Product Description - Short - 20:SWITCH - DOOR LOCK AAIA Part Type Description:11722

Switches / Controls for Sale

Caterham announces cut-price Seven 160 sports car

Wed, 23 Oct 2013

BRITISH sports car maker Caterham has announced a new low- priced version of its long-running Seven model. Dubbed the Seven 160, the new model starts at a measly £14,995 in component form or £17,995 fully built. Under the bonnet there is a turbocharged 660cc Suzuki engine and although this only offers up a modest 80bhp, that's still enough to power the lightweight Seven from 0-60mph in 6.5 seconds.

Ford overhauls Michigan plant to build new Focus

Wed, 06 May 2009

Ford will spend $550 million to retool an assembly plant in suburban Detroit to build the redesigned 2011 Ford Focus. Production is to start next year. As part of the overhaul, the plant, known as Michigan Assembly, also will build an electric-powered version of the new Focus.

Jaguar XF and Range Rover Evoque to be built in India

Tue, 18 Oct 2011

Jaguar XF Range & Rover Evoque to be assembled in India The news that Jaguar Land Rover are planning to assemble the Range Rover Evoque and Jaguar XF in India isn’t exactly a huge surprise. If anything, the surprise is it’s taken this long for them to get round to it. Of course, this isn’t JLR’s first foray in to assembling cars in India, as the Freelander 2 is now being bolted together in Pune now the CKD facility at Halewood is up and running.