Snap On Tools New Unused 44 Piece 1/4 Dr Metric / Fractional General Service Set on 2040-parts.com
Saint Petersburg, Florida, US
Sockets & Ratchets for Sale
- Snap-on impact swivel socket set shallow 1/2" 6 point 3/4 5/8 9/16 1/2 7/16 (US $0.99)
- Sockets 1/2 drive(US $7.00)
- 1/2 ratchet (US $10.00)
- New snap on 1/2" 7 piece hex socket driver set 5/16 - 3/4 307esay - made in usa(US $189.00)
- Snap on tools new in the wrapper 6 piece 1/4 drive sae. short swivel socket set(US $199.99)
- Sk s-k superkrome 47130 15/16" chrome socket, 3/4" square drive, 12-point, new(US $19.59)
BMW i3 Coupe EV in production end of 2013 (video)
Sun, 16 Dec 2012The BMW i3 Coupe Concept will go in to production at the end of 2013, and BMW tell us why the i3 is so important in a new video. We’ve already got the little i3 in the mix and due to arrive in 2013 (although it could come with the more pragmatic option of a range extender instead of as a pure EV) and the i8 supercar is well on its way. But after the reveal of the BMW i3 Coupe Concept at the Los Angeles Auto Show last month, BMW has confirmed the i3 Coupe will go in to production by the end of 2013, and it will be an EV.
Poor driving posture a pain in the neck
Wed, 28 May 2014THE WRONG driving position could be putting millions of commuters' health at risk, according to a major physiotherapists' organisation. Drivers who don’t adjust their car seat and steering wheel to suit their individual needs are risking significant further problems, says the Chartered Society of Physiotherapy (CSP). Latest census figures for England and Wales reveal that almost two-thirds of workers (15.3 million) commute by car and the CSP says poor driving posture is a key factor that can lead to musculoskeletal problems such as back and neck pain.
Toyota says quake-hit plants escape major structural damage
Tue, 15 Mar 2011Toyota Motor Corp. has released the first damage report for its northern Japanese factories in the region hammered by Friday's massive earthquake, saying some equipment and fixtures will need repairs but that the plants sustained no major structural harm. For days after the quake, Toyota had trouble contacting it plants in the northern Japan quake zone, making it difficult to assess their status.