Sno Way Pro Control Controller With Charger Used on 2040-parts.com
Champlain, New York, United States
SNO WAY PRO CONTROL CONTROLLER WITH CHARGER USED TESTED_ WORKS GREAT, US CUSTOMERS ONLY snow within 90 days this controller is like new I used it a total of three times and than truck got wrecked and ins company took truck this is a good deal on this controller SHIPPING IS $7.99, THANKYOU, |
Snow Plows & Parts for Sale
- Sno-way wireless controler part #96114034 four prong flat plug(US $199.99)
- Fisher v plow handheld snowplow controller 96900, 10 prong !!!(US $224.99)
- Western 9' chevy snow plow setup unimount 1988-98 heavy duty(US $2,799.00)
- Sno way pro control wireless controller battery **new**(US $54.95)
- Chevy used western snow plow harness truck unimount for parts was cut.(US $75.00)
- Boss plow joy stick(US $150.00)
2014 Subaru WRX and STI pricing released
Thu, 08 Aug 2013The Subaru WRX and WRX STI are now in their final model year before they're replaced by an all-new version, and Subaru has just released prices for the 2014 model year. Both cars get a $200 bump for 2014, and destination charges rise, too. The 265-hp 2014 WRX will now start at $26,790 and will be keeping its 2.5-liter turbocharged and intercooled four-cylinder boxer engine and five-speed manual transmission.
Nissan Juke-R (2012) goes into production
Fri, 04 May 2012Nissan has announced that its Juke-R prototype will enter limited production on a build-to-order basis. Yes, really. The Juke-R is the result of the Nissan Europe Technical Centre in Cranfield teaming-up with UK motorsport engineering firm RML to stuff the powertrain of a Nissan GTR into a Nissan Juke bodyshell to create 'the world's fastest crossover'.
No M4 relief road 'before 2020'
Thu, 07 Nov 2013A "RELIEF ROAD" for the M4 in south Wales is unlikely to be constructed before 2020, a leading transport expert has told Welsh Assembly Members. A new stretch of motorway south of Newport could be back on the cards after the UK ministers announced the possibility of Welsh Government borrowing the money needed for the scheme. However the re-emergence of proposals to ease traffic on Wales' heavily congested western gateway prompted fierce debate during a committee hearing in the Senedd.