Speaker - Bmw E36 Midrange Beige - 65 13 8 362 957 on 2040-parts.com
Costa Mesa, California, US
This part fits BMW E36 after 9/94 all Coupes and Sedans. Beige midrange speaker. This part is new and never installed. Selling out of old inventory.
Speakers & Speaker Systems for Sale
- Speaker - bmw e36 door loudspeaker - pergament dkl. - 65 13 8 357 674(US $25.00)
- Speakers!!(US $30.00)
- Speaker - bmw e28 or e24 - door loudspeaker - 65 13 1 377 771(US $33.00)
- Lexus ls400 front driver left door stereo speaker pioneer 90 91 92 93 94 1990(US $29.99)
- Lexus ls400 front passenger right door stereo speaker pioneer 90 91 92 93 94(US $29.99)
- Precision power 15in 600w rms dvc 2-ohm woofer car speaker(US $81.79)
VW New Compact Coupe at Detroit motor show 2010
Mon, 11 Jan 2010This is Volkswagen’s New Compact Coupé (or NCC for short), a new coupé concept car just unveiled at the 2010 Detroit Auto Show. And although it’s just a show car for now, this gorgeous A5-alike two-door is expected to go into production within the next two years. Under the bonnet is a 148bhp/177lb ft direct-injection and turbocharged 1.4-litre TSI engine, which drives the front wheels via a seven-speed DSG gearbox.
Audi A3 Cabriolet signs off with A3 Cabriolet Sport and S line Final Edition Models
Wed, 30 Jan 2013Audi signals the end of the current A3 Cabriolet with two run-out models – the A3 Cabriolet Sport and S line Final Edition. Price from 23,775. The end of the current Audi A3 Cabriolet is fast approaching, but not before Audi wring out extra sales this spring (yes, spring really isn’t that far off) with the launch of a pair of final edition A3 Cabriolets.
BID TO SLOW TRAFFIC ON M3 STRETCH
Fri, 14 Feb 2014FIRST it was a stretch of the M1 and now the same speed reduction plan has been announced for a stretch of the M3 motorway in Surrey and Hampshire. The Highways Agency (HA) has proposed that a three-mile section of the M3 between junction 3 at Lightwater in Surrey and junction 4 near Farnborough in Hampshire be subject to a 60mph restriction. This section is part of a 13.4-mile stretch that is being upgraded in a £174 million scheme, with the 60mph proposal, to operate between 7am and 7pm daily so air quality levels can be met.