Find or Sell any Parts for Your Vehicle in USA

Spectra Premium F39e Fuel Tank on 2040-parts.com

US $136.65
Location:

Farmington, Michigan, US

Farmington, Michigan, US
Returns Accepted:Returns Accepted Refund will be given as:Money Back Item must be returned within:30 Days Return policy details:Return Policy We are committed to providing the best customer satisfaction possible. We will gladly refund or replace any defective item and most non-defective items. However, we reserve the right to charge a restocking fee of 20% of the order. Within 14 days of receipt of your order, you may return products that are: in their original undamaged packaging, Have original manufacturer information, Are not used, installed, or disassembled, Are not damaged due to incorrect installation, Do not having missing parts, hardware or instructions. The following orders are not returnable: Custom or special orders Automotive repair manuals Electrical Parts and Components (Such as: ECU's, Push Button Units, relays, air mass meters, etc) Once we have received your return, conducted an inspection of the return, and verified that your return meets the above guidelines, a full refund will be issued. All applicable sales taxes will be refunded. The cost of shipping will be credited only in those instances that the return is a result of our error. C.O.D. shipments will not be accepted. Items incorrectly shipped to Value Auto Parts will not be returned. Items not purchased from Value Auto Parts will not be accepted. Please allow up to 4 business days after we have received the products for your refund to be issued. Thank you. Return shipping will be paid by:Buyer Restocking Fee:No Part Brand:SPECTRA PREMIUM Manufacturer Part Number:F39E SME:_2691 UPC:00671607936995 Harmonized Tariff Code (HTS):8708998180 Life Cycle Status Code:2 Harmonized Tariff Code (Schedule B):8708998175 Country of Origin (Primary):CA Life Cycle Status Description:Available to Order Pallet Footprint Size UOM:IN MSDS Required Flag:N National Popularity Code:B Pallet Layer Maximum:3 Emission Code:1 Pallet Footprint Size:40 x 48

British Grand Prix Silverstone 2008 Race Report | CAR Magazine Online

Wed, 25 Jun 2008

By Tim Pollard Motor Shows 25 June 2008 09:30 We could have done some crystal ball gazing, but no – we haven’t written our review of the 2008 British Grand Prix yet. However, once the race is over on 6 July 2008, our F1 correspondent will scribble his report as quickly as Mssrs Microsoft and Yahoo will allow. Click here to read Tom Clarksons Race report  

Crunch watch Mar 09: the auto industry in crisis

Tue, 31 Mar 2009

By Ben Pulman and Tim Pollard Motor Industry 31 March 2009 13:48 Tuesday 31 March 2009• Porsche said that its earnings before tax rose to €7.3 billion in the six months to the end of January – including a €6.8bn windfall from its VW share options (Financial Times)• Fritz Henderson, GM's president and chief operating officer, will step up to replace Rick Wagoner, who was ousted on Sunday as CEO of General Motors (Financial Times)• President Obama is essentially CEO-in-chief of GM – despite not owning a single cent of stock, says Detroit News commentator (Detroit News)• German chancellor Angela Merkel gives assurances that any would-be investors in GM's European arm will be given state support. Opel is asking for €3.3 billion in aid – and up to 25,000 jobs in Germany depend on it, with up to 300,000 jobs across Europe including Saab and Vauxhall (BBC News)Monday 30 March 2009• General Motors' chief executive Rick Wagoner has been ordered to resign by US president Barack Obama with immediate effect. It's part of Obama's administration's critique of GM and Chrysler's turnaround plans – he's understood to be unhappy with the plans submitted (BBC News)• New GM non-executive chairman Kent Kresa has admitted that at the company's next general meeting it will have 'a majority of new directors' (General Motors)• Chrysler will receive US government aid for the next 30 days, but the Obama administration has said that if the company cannot secure a tie-up with the Fiat Group within that time period it will not receive any more money from the taxpayers and could go into liquidation.

GM plants solar field at Chevrolet Volt factory

Wed, 11 May 2011

Looking to put a charge in its eco-friendly image, General Motors is installing a 264,000-square-foot solar field at the Detroit-Hamtramck assembly plant that builds the Chevrolet Volt plug-in hybrid sedan. The solar field, being built in cooperation with utility DTE Energy, will generate 516 kilowatts. GM says that’s enough power to charge up 150 Volts every day for a year.