Find or Sell any Parts for Your Vehicle in USA

Stabilizer Bar Classic Style Front Fits 07-19 Silverado 1500 Pickup 840153 on 2040-parts.com

US $48.30
Location:

Condition:Used: An item that has been used previously. The item may have some signs of cosmetic wear, but is fully operational and functions as intended. This item may be a floor model or store return that has been used. See the seller’s listing for full details and description of any imperfections. See all condition definitions Conditions & Options:FRONT, OFF AND READY TO GO! Genuine OEM:Yes Interchange Part Number:524-00652 Designation:Used PartNumber:524 Mileage:Unknown Model:ESCALADE Make:CADILLAC Year:2007 Stock #:210854 MPN:Does Not Apply Manufacturer Part Number:Does Not Apply GTIN:Does not apply Inventory ID:840153 VIN #:1GYFK63847R270101 Donor VIN:1GYFK63847R270101 Brand:APF

Ford debuts another Australian hot rod

Mon, 27 Aug 2012

Ford's Australian-based Performance Vehicles operation has unveiled its fastest car to date—the Falcon-based FPV GT R-spec. To be assembled at Ford Performance Vehicle's headquarters on the outskirts of Melbourne, the rear-wheel drive GT R-spec packs the same engine as the earlier GT335, a supercharged 5.0-liter V8 producing 449 hp and 420 lb-ft of torque. But, a range of chassis modifications, including a retuned suspension, wider 19-inch rear wheels and tires and new launch control system are claimed to provide the greater off-the-line speed than any previous model from Ford's Australian outpost.

TVR goes off the rails

Tue, 02 Jan 2007

By Tim Pollard Motor Industry 02 January 2007 03:25 British sportscar manufacturer TVR is fighting for survival after crashing into administration over Christmas. Blackpool Automotive Ltd, TVR's manufacturing arm, has stopped building cars at the Blackpool HQ, its home since 1947. Around 250 members of staff stayed at home this week, waiting to discover their fate.

Britain to be third global production site for the Nissan Leaf EV after Japan, U.S.

Thu, 18 Mar 2010

Nissan Motor Co. said it will build the new Leaf electric vehicle at Britain's Sunderland assembly plant starting in early 2013, with initial capacity of 50,000 units. The Japanese company and its French alliance partner Renault will invest more than $642.6 million in the project, including the construction of a lithium ion battery plant on the site.