Stainless Steel 5 Spoke Marine Steering Wheel With Black Pu Foam 13.5" With Knob on 2040-parts.com
苏州, 江苏省, China
Stainless Steel 5 spoke Marine Steering Wheel With Black PU Foam 13.5" with knob Material : stainless steel with black PU foam
Size: 13-1/2''
Shaft : 3/4''
Dish : 25°
Foam : Black |
Controls & Steering for Sale
- 32" keyed chrome steering column floor shift(US $238.50)
- 33" blue push button start chrome steering column automatic with gear(US $427.50)
- 33" green push button start chrome steering column automatic with gear(US $427.50)
- 33" chrome steering column automatic with built in ignition switch gear(US $292.50)
- 32" green push button start chrome steering column floor shift(US $337.50)
- 33" chrome steering column automatic with gear indicator window and shifter(US $169.20)
Lamborghini Estoque – still on?
Mon, 28 Sep 2009Lamborghini Estoque spotted in Berlin The boys at Top Gear even got hold of the Estoque to show in the TG studio. They too were astonished at what Lamborghini has achieved. A four-door Lamborghini that looked like a Lamborghini instead of some hideously overblown caricature of the marque (did someone say Panamera?).
Video: Possible new Pantera spotted in Italy
Thu, 05 May 2011A YouTube video shows what appears to be the newest evolution of the hallowed De Tomaso Pantera. Caught leaving the De Tomaso factory in Grugliasco, Italy, the heavily camouflaged two-door coupe did not muffle the brawny engine sound. The rumor mill is speculating about a V8 powerplant sourced from Ford, like the original, and an aluminum body.
Secret Service issues call for next presidential limousine
Fri, 14 Mar 2014The Secret Service is mulling a replacement for Barack Obama's presidential limousine, the Cadillac-styled vehicle lovingly nicknamed "The Beast." News of the new limousine first reached the Internet via FedBizOpps.gov, the official site for Federal Business Opportunities, which provides listings and contracts for various government projects. (Some other listings included cleaning the kitchens at Okinawa, Coast Guard ship repair, and "Phacoemulsification Surgical Equipment.") It calls for a four-phase development program, which is seemingly straightforward. Phase 1 is armor development -- which is currently underway.