Starion Conquest 88 Shift Knob Perfect Shape on 2040-parts.com
Pasadena, Texas, US
In perfect shape starion conquest 88 5 speed shift knob.
Posted with eBay Mobile
Shift Knobs & Boots for Sale
- New shift knob shifter control manual fit vw mk4 jetta bora golf gti 5-speed (US $12.59)
- Brand new aluminum brake handle knob for bmw m tech e39 e60 m5 e36 e46 silver(US $33.05)
- Vintage black 3 speed shifter knob 3/8 - 16 threads vintage hurst shifters(US $25.00)
- Emergency brake handle cover billet aluminum spectre 6428 civic neon #386(US $8.95)
- Sti shift trim(US $99.00)
- 97-01 lexus e300 shift knob oem(US $89.00)
CAR reader designs Audi R10 supercar
Wed, 11 Nov 2009We’re rather keen on Audi’s R8, but one day Ingolstadt is going to have to replace its seminal supercar. And after seeing CAR reader LexOrABenz's design, we think we know what Audi's next halo car should look like. LexOrABenz is actually Marouane Bembli, a 23-year old indsutrial design student from Sweden.
Google Glasses driver has ticket torn up
Tue, 21 Jan 2014An American driver who was fined for driving while wearing Google Glasses has had the ticket torn up. Cecilia Abadie was stopped by police in California who said the Google Glass digital spectacles fell foul of laws banning drivers from watching TV when behind the wheel. Woman ticketed for driving with Google Glasses On Bing: see pictures of Google Glass However, Abadie claimed the Glasses were not switched on – and do not give drivers any blind spots.
Call for reform over road repair funding
Fri, 06 Jun 2014FUNDING patterns mean most road maintenance is being carried out in "less-efficient, cold and wet" times, a report from a Government spending watchdog has said. The current pattern of funding, combined with the need to spend money within the financial year, means that most maintenance work goes on between September and March, said the report from the National Audit Office (NAO). It went on: "Although this is less disruptive for road users, it is less efficient than carrying out the work at other times of year because materials can be more difficult to handle in cold and wet conditions, and daylight hours are shorter." The report went on: "As a result of the additional funding for emergency repairs, which is made available at the end of the financial year, almost all highways authorities need extra capacity from the market at the same time, which makes it less likely that they will get value for money." The NAO report said there was a "lack of predictability" over road spending adding that historically, local highway authorities spent more revenue on maintenance, but were now carrying out fewer routine activities such as clearing gullies which are essential to preventing water seeping into roads' sub-structure.