Find or Sell any Parts for Your Vehicle in USA

Stewart Warner Water Temp Temperature Gauge 82702 280 Degrees on 2040-parts.com

US $19.99
Location:

Ravenna, Ohio, United States

Ravenna, Ohio, United States
This item was stated to have worked when it was removed.
Brand:Stewart Warner Placement on Vehicle:Front Manufacturer Part Number:82702

Rolls-Royce debuts Ghost Series II at Geneva motor show

Tue, 04 Mar 2014

The Rolls-Royce Ghost has been with us for five years, and for 2015 the company has treated the sedan to a number of design tweaks inside and out, and has brought the refreshed Series II Ghost to the Geneva Motor Show this week. The changes to the outside are hard to spot at first, and Rolls-Royce readily admits that the revisions that have been made to the exterior are rather subtle. By far the most obvious visual difference, one that will help identify this as a Series II sedan, are the headlights which have been treated to a redesign, and are no longer perfectly rectangular.

Lexus LF-NX Concept Compact SUV with 2.0 litre turbo petrol at Tokyo

Mon, 04 Nov 2013

Lexus LF-NX Concept Compact SUV (pictured) with 2.0 litre turbo petrol at Tokyo The Lexus LF-NX Concept debuted at the Frankfurt Motor Show in September, and certainly made a statement. Lexus’ efforts to create an SUV/Crossover to sit below the RX and mop up some of the ever-growing demand for more compact SUVs tried hard to do the whole ‘Ugly but appealing’ school of design the Nissan Juke pulled off, but pretty much failed. There were some good ideas running around, but there were just too many jarring angles on the bodywork and not enough cuteness to love and the interior was very ‘concepty’ with a sea of blue and yellow everything and touchscreen surfaces abounding.

GM plants solar field at Chevrolet Volt factory

Wed, 11 May 2011

Looking to put a charge in its eco-friendly image, General Motors is installing a 264,000-square-foot solar field at the Detroit-Hamtramck assembly plant that builds the Chevrolet Volt plug-in hybrid sedan. The solar field, being built in cooperation with utility DTE Energy, will generate 516 kilowatts. GM says that’s enough power to charge up 150 Volts every day for a year.