Hoods for Sale
- Hood assembly primered black steel panel for 96-99 chrysler sebring conv 2dr(US $161.31)
- 2002-2005 ford explorer aluminum primered hood 4dr suv nbx eddie bauer wo sport (US $202.95)
- Suzuki kei 1999 hood [0410500](US $579.00)
- Toyota vitz 2005 hood [6110500](US $679.00)
- 1993-1997 corolla hood primed black steel capa part certified panel replacement(US $97.91)
- 1999-2000 cadillac escalade primered hood steel panel assembly replacement(US $294.90)
Toyota Yaris Facelift revealed
Tue, 22 Apr 2014The 2014 Toyota Yaris (pictured) gets a new look It’s only a few months since the Toyota Yaris got a series of updates for 2014, but despite that Toyota has rolled out a full facelift for the Yaris which will arrive in Toyota showrooms this summer. Building on the styling of the new Toyota Aygo, the new Yaris gets a cosmetic makeover on the exterior including the same cross shape nose with a central Toyota logo, new upper and lower grills, LED tail lights, diffuser in the back bumper and a new shape number plate surround. Inside, Toyota say they’ve invested a lot of work to make the cabin of the Yaris better and given it a greater feel of roominess and dynamic appeal, more choices of equipment and trim and a more upmarket feel.
Jaguar XFR (2009) tops 225mph at Bonneville
Tue, 13 Jan 2009By Sarah-Jayne Harrison Motor Industry 13 January 2009 16:00 Jaguar's new XFR has reached 225.675mph, making it the fastest car Coventry has ever produced. Running at a secret test at the Bonneville Salt Flats, the one-off prototype, using a tweaked version of Jaguar's new supercharged 5.0-litre V8, topped even the legendary XJ220's 217mph top speed. Not a chance.
A9 cameras already curbing speeders
Wed, 18 Jun 2014NEWLY-INSTALLED cameras on one of Scotland's most notorious roads are already cutting drivers' speed. The average-speed cameras on the A9 have not yet been switched on, but have nonetheless seen the number of motorists breaking the speed the limit on the Perth to Pitlochry stretch drop from one in three to one in 10. Work began to install the devices from Perth to Inverness last month, one of a number of planned measures to improve safety on the main route connecting central Scotland and the Highlands.