Throttle Body - 4.5l - 88-89 Cadillac Seville, Fleetwood, Deville, Eldo on 2040-parts.com
Denver, Colorado, US
Nice used throttle body for a 1988-1989 Cadillac Deville, Seville, Fleetwood, Eldorado 4.5L engine. Throttle body is all complete. Came off a knocking engine. Factory part number on body is 17085011.
Throttle Body for Sale
- Throttle body - 1986-1989 - 4.1l cadillac deville, seville, eldorado, fleetwood(US $45.00)
- 03 04 05 06 lincoln ls thunderbird 3.9l electronic throttle body(US $149.99)
- 99 00 01 volvo s70 c70 s60 s70 s80 throttle body 9186793, 65cfm2 (US $105.00)
- 1990 63mm 4g63 dsm turbo throttle body (US $274.95)
- 1999-2001 ford explorer 5.0 65mm throttle body(US $49.99)
- 99 diamante throttle body with traction control(US $29.99)
Subaru WRX STI beats Tony Pond’s Isle of Man lap record
Fri, 10 Jun 2011Mark Higgins beats the TT course in to submission Tony Pond was a rally driver in the 1970s and ’80s, and he was rather good. Good enough to give the likes of Jimmy McRae a spanking from time to time and to drive in umpteen works cars, from Ford to Rover via Datsun. But Tony Pond is probably best remembered for piloting a Rover 827 Vitesse round the Isle of Man TT Circuit in 1990 at an average speed of over 100mph, the first time that had been done.
NHTSA upgrades probe into Jeep fuel tanks
Thu, 14 Jun 2012The National Highway Traffic Safety Administration has upgraded its investigation into the fuel tank on three Jeep models to an engineering analysis, another step toward what could become a recall. Safety advocates say the location of the fuel tank, mounted behind the rear axle, makes it prone to catching fire in the event of a rear crash. The investigation covers Jeep Grand Cherokees built between 1993 and 2004, Jeep Cherokees built between 1993 and 2001, and Jeep Liberty SUVs built between 2002 and 2007.
Detroit Electric delays SP:01 EV
Mon, 03 Jun 2013Detroit Electric will delay the SP:01 EV roadster for at least a month, according to a company executive who talked to the Detroit News. The company still hasn’t finalized a manufacturing location in Wayne County. Production was scheduled to start in August, now it’s slated for September.