Find or Sell any Parts for Your Vehicle in USA

Tow Ready 118368 Wiring T-one Connector Ram 1500 Van Ram 2500 Van Ram 3500 Van on 2040-parts.com

US $23.25
Location:

Multiple Warehouses, United States

Multiple Warehouses, United States
Condition:New Brand:Tow Ready Warranty URL:http://www.catalograck.com/ImgVD/TOR/Cequent_Limit Manufacturer Part Number:118368 Part Brand:Tow Ready Merchandising Name:Wiring T-One Connector UPC:016118057850

Skoda Yeti Facelift: Price from £16,600

Fri, 04 Oct 2013

The Skoda Yeti Facelift costs from £16,600 – where you have the Yeti or Yeti Outdoor But the differences between the two don’t mean a price differential; the Yeti and Yeti Outdoor cost the same on a like for like basis, although the 4×4 versions are only available in the Yeti Outdoor – complete with a new fifth-generation Haldex Clucth 4×4 – for a price premium. The Yeti range starts with the Yeti S 1.2 TSI 105PS at £16,600 and tops out at the Yeti Outdoor L&K 2.0 TDI 140PS 4×4 DSG at £27,050, with three trim levels – S, SE and Elegance – available across both the Yeti and Yeti Outdoor, with the Outdoor also getting a range-topping L&K trim level. Engines on offer include the aforementioned 1.2 TSI and 2.0 CDI with the 1.6 TDI, 1,8 TSI and three versions of the 2.0 TDI – 110PS, 140PS and 170PS – available.

The AutoWeek list: Top all-time convertibles for driving fun

Wed, 24 Jun 2009

With the first few days of summer behind us, we got to thinking about our favorite summer pastimes. Clearly they include barbecue grilling, eating ice cream and taking long drives with the top down (the cars', not ours). It's time to contemplate the top convertible rides of all time might be.

'Paradox' in transport policy claim

Tue, 26 Nov 2013

THERE IS A "paradox at the heart" of the Government's roads programme, a transport policy professor has told MPs. The question on whether traffic levels would increase or decrease in the future was unresolved, University College London emeritus professor of transport policy Phil Goodwin told the House of Commons Transport Committee. The paradox was that if traffic levels increased the planned roads programme was "not big enough to make an improvement", he said.