Find or Sell any Parts for Your Vehicle in USA

Toyota 4a-fe 4afe Ae95 Ae92 T25 Turbo Charger Kit Psi Fmic Bov Piping Oil Line on 2040-parts.com

US $1,079.99
Location:

Rowland Heights, California, US

Rowland Heights, California, US
Returns Accepted:Returns Accepted Refund will be given as:Money Back Item must be returned within:30 Days Return policy details:For your protection and for us to handle your returns in a most appropriate manner, please read the details of our return policy within item description under the Return Policy banner. Return shipping will be paid by:Buyer Restocking Fee:No Part Brand:kospeed2008 Manufacturer Part Number:KOS-TBK-KOS-4AFE-S-T25-Auctions

Turbo Chargers & Parts for Sale

2012 British Grand Prix: Alonso takes pole for Ferrari at Silverstone

Sat, 07 Jul 2012

Ferrari’s Fernando Alonso has taken pole position in a rain-soaked qualifying at Silverstone for the 2012 British Grand Prix. Just like the rest of the UK in this miserable summer, Silverstone was soaked by endless rain with qualifying held up for an hour and a half as conditions became too dangerous to continue. Before the break – halfway through Q2 – Jenson Button had already succumbed to the conditions after slowing under a yellow flag after Timi Glock spun on a wet track leaving Jenson no time to set a time.

Italian Grand Prix (2014) RESULT

Sun, 07 Sep 2014

Italian Grand Prix (2014) RESULT After the difficulties of Spa for lewis Hamilton two weeks ago, he’s managed to take pole position in the 2014 Italian Grand Prix at Monza, pushing team mate Nico Rosberg in to second place. But can he hold on to that advantage? The answer is: yes and no.

BID TO SLOW TRAFFIC ON M3 STRETCH

Fri, 14 Feb 2014

FIRST it was a stretch of the M1 and now the same speed reduction plan has been announced for a stretch of the M3 motorway in Surrey and Hampshire. The Highways Agency (HA) has proposed that a three-mile section of the M3 between junction 3 at Lightwater in Surrey and junction 4 near Farnborough in Hampshire be subject to a 60mph restriction. This section is part of a 13.4-mile stretch that is being upgraded in a £174 million scheme, with the 60mph proposal, to operate between 7am and 7pm daily so air quality levels can be met.