Find or Sell any Parts for Your Vehicle in USA

Toyota Noah 2002 Radiator [6820400] on 2040-parts.com

US $299.00
Location:

Minato-ku, Tokyo, Japan

Minato-ku, Tokyo, Japan
Condition:Used

2015 Porsche Macan SUV drive review

Tue, 08 Oct 2013

Remember the turbulent launch of the Porsche Cayenne? It was 2002, and the company whose very existence was built upon a line of legendary sports cars was about to do something its boss at the time had earlier pledged would never happen. Namely, add an SUV to its line-up.

Volkswagen hits back, weighs making a bid for Porsche

Thu, 23 Apr 2009

Volkswagen is considering an audacious reverse-takeover bid for its majority shareholder, Porsche, in a twist in the drawn-out struggle for control between the two German carmakers. The Volkswagen Group's supervisory board is said to be weighing the possibility of purchasing Porsche AG, in a move that would relieve its holding company, Porsche SE, of massive debt that industry analysts suggest the company may not be able to fund should the world's financial crisis drag on well into 2010--a scenario put forward this week by the International Monetary Fund. The secret plan emerged as shareholders were set to convene at Volkswagen's annual meeting on Thursday, and it comes after Porsche revealed that it is carrying some 9 billion euros ($11.73 billion) in debt, most of it owing to interest on loans taken out to purchase its 50.8 percent stake in VW.

Report Claims Pothole Repair Blackhole Is £12bn

Thu, 03 Apr 2014

FIGURES from the Asphalt Industry Alliance (AIA) have revealed the extent of the nation’s pothole crisis, with a report claiming the "catch-up" cost of getting roads back into reasonable a condition has soared to £12 billion. The total is an increase on the £10.5 billion figure reported last year, and remains high despite more than two million potholes being filled in England and Wales over the last 12 months. This was despite a 20% decrease in the shortfall in annual road maintenance budgets reported by local authorities, with the shortfall reducing from an average of £6.2 million to £5.1 million per authority in England.