Other for Sale
- Hi-miller straight radiator hose goodyear black color 2" x 4 feet wire inserted
- Banks power 45151 straight-shot-water-methanol injection system(US $1,240.90)
- Maximizer black 38mm 2-bolts flange external compact wastegate 7, 11, 14 psi(US $199.00)
- Mishimoto universal silver g line bar & plate intercooler- size: 24.5 x 11.75 x3(US $212.00)
- Nyppd universal greddy bov blow off valve 1.25" bolt on adapter 1/ 1/4 in alumin(US $32.99)
- Nyppd universal hks type bov blow off valve 1.25" clamp on adapter 1 1/4 in(US $32.99)
Monaco Grand Prix (2011) RESULT
Mon, 30 May 2011Monaco Grand Prix 2011 - it even had overtaking Far from being a long line of very expensive F1 cars following each other round the streets of the Grimaldi Empire, the 2011 Monaco Grand Prix was full of incident, accident and overtaking. Oh, and a dose of petulance too. Let’s cut to the chase: Vettel won yet again – from pole – and extended his lead to the point where many will say he’s un-catchable.
Brabus builds Mercedes-Benz B63S - 700 Widestar for Dubai Police
Wed, 06 Nov 2013It's not about catching the bad guy, it's about driving something so cool that the bad guy pulls over just to stare in awe at your police cruiser. Until now that meant Mercedes-Benz G55 AMGs in Eastern European capitals orthat one Lamborghini Gallardo from Italy that's been making the rounds on the Internet so long that even your grandmother knows what jurisdiction in Italy it belongs to and which autostrades it patrols. Well, we suspect that the bar for most spectacular police vehicle has been raised once again with the delivery of the 700-hp Brabus B63S - 700 Widestar G-class to the Dubai police and its appearance at the Dubai Motor Show.
Councils to cut roadworks red tape
Tue, 19 Aug 2014COUNCILS in England could soon have the power to cut red tape and make road works much quicker and more accountable. The plan is to introduce permits for any company that wants to dig up a road, which means they will have to co-ordinate their work with other companies and local authorities to reduce the impact of delays on the public. The permit scheme could come into force as early as April 2015 and means anyone applying for a permit to carry out road works will need to present a convincing case for the work.