Tuff Stuff Performance 6196a Saginaw Style Power Steering Pump on 2040-parts.com
Sanford, FL, United States
Power Steering Pumps & Parts for Sale
- Gates 353580 power steering pressure hose(US $25.02)
- Tuff stuff performance 6190b saginaw style power steering pump(US $174.83)
- Acdelco 15286010 new power steering pump(US $486.15)
- Power steering pressure line hose assembly acdelco pro 36-365480(US $37.03)
- Power steering pressure line hose assembly acdelco pro 36-353980(US $27.03)
- Power steering pressure line hose assembly acdelco pro 36-360810(US $40.99)
Mercedes C 180 CGI BlueEFFICIENCY Review & Road Test (2010)
Sun, 15 Aug 2010The Mercedes C180 CGI BlueEFFICIENCY in for a week for Review & Road Test There was a time when you knew what lurked beneath the bonnet of a Mercedes; the badge on the boot shouted it loud and clear. If it was an S500 you knew it had a 5.0 litre engine and if it said C180 you could safely assume you’d get a modest 1.8 litre lump to row Mercedes’ smallest saloon along. But things have got a bit more complicated over the years; probably because the cubic capacity of the engine is not necessarily an indication of its power.
Cadillac CTS-V priced to undercut M5, XFR
Wed, 21 Jan 2009By Gareth Evans Motor Industry 21 January 2009 10:17 Cadillac’s new CTS-V supersaloon – claimed to be the be the most powerful Cadillac ever built – will undercut its European competition by several thousand pounds. Prices will start at £56,495, positioning the new Cadillac CTS-V just below the new Jaguar XF-R (£59,900) and comfortably undercutting German rivals such as the BMW M5 (£63,325) and Audi RS6 (a fulsome £74,550). Performance figures for the CTS-V make interesting reading, with 60mph being dispatched in 3.9 seconds and a top speed of 191mph for the manual car (175mph for the automatic).
July 9: Keeping it topped off
Fri, 09 Jul 2010As expected, when I walked back to my parking space at VSP parking across the street from Burbank Airport the i-MiEV was fully charged. No problem. It had more than 24 hours to get charged and it can't take more than 16 hours to do it, if you figure one hour per kWh at 120 volts.