Tuff Stuff Performance 7127na Replacement Alternators 80 Amps V-belt - on 2040-parts.com
Mount Pleasant, Michigan, US
Other for Sale
- Tuff stuff performance 7127nb6g one-wire alternators 80 amps - tfs7127nb6g(US $108.91)
- Tuff stuff performance 6508b saginaw power steering brackets chevy black -(US $103.91)
- Tuff stuff performance 7078nb one-wire alternators v-belt 70 amps - tfs7078nb(US $144.91)
- Tuff stuff performance 6507a driver side chrome saginaw power steering brackets(US $127.91)
- Tuff stuff performance 7127nap chrome replacement alternators 80 amps -(US $106.91)
- Tuff stuff performance 7127nc v-belt 100 amps replacement alternators -(US $108.91)
Smart: the best concepts and special editions
Fri, 18 Jul 2014By James Clark Motoring Issues 18 July 2014 11:24 As Smart lifts the lid on the new ForTwo and ForFour this week, CAR magazine looks back on wonderful, wacky and downright woeful Smart special editions and concepts that have been created since the diminutive City Coupe first arrived on the scene in 1998. The Crossblade was a 2002 special edition based on the cabrio version of the city car. Its Brabus-tuned motor put out 70bhp and the car weighed just 740kg.
Motown rockers Dale Earnhardt Jr. Jr. serve up Horse Power
Fri, 06 May 2011NASCAR fans looking for a new soundtrack to their auto-racing season can trade in their Lynyrd Skynyrd records for an offering from Detroit-based indie-pop duo Dale Earnhardt Jr. Jr. In a nod to their Motor City roots, band members Josh Epstein and Daniel Zott take the stage wearing racing suits and trucker hats and croon covers of Gil Scott-Heron's “We Almost Lost Detroit.” The band, which is touring the East Coast this week, released an EP titled Horse Power last summer and is coming out with its first full-length album, It's a Corporate World, on June 7.
Ford Design Center set to expand
Wed, 13 Apr 2011Symbolic of the importance it plays in Ford's small car strategy, the automakers Design Center in Cologne, Germany, is about to receive a €11.6m redevelopment. Construction is already underway on the facility's new wing, which will include design studios and 100 workplaces. The 3,000 square-meter extension is set to be completed by the end of the year.