Find or Sell any Parts for Your Vehicle in USA

Two Brand New Ford 352-390-427-428 Timing Cover Gasket Sets-priced Cheap!!! on 2040-parts.com

US $20.00
Location:

Lockport, Illinois, United States

Lockport, Illinois, United States
Condition:New

UP FOR SALE IS TWO COMPLETE TIMING CHAIN GASKET SETS FOR FORD OR MERCURY 352-390-427-428 ENGINES. BRAND NEW IN THE PLASTIC PACKAGING AND THEY INCLUDE THE OIL PAN GASKET AS WELL AS THE CRANKSHAFT SEAL. PRICED CHEAPLY. THANKS FOR LOOKING AT MY AUCTIONS!

Timing Components for Sale

BMW vs Winter: how to beat the freeze

Tue, 17 Dec 2013

By Phil McNamara First Official Pictures 17 December 2013 09:00 Winter: the long nights, slippery roads and punishing weather can turn driving from a pleasure into a chore. But to ensure you get home safely this winter – or merely to entertain you with our antics – we’ve created some stories and videos of us tackling wintry conditions in cars. • WINTER TYRES: we took an M3 on summer tyres and a 435i coupe on ADD LINK winter tyres to Pirelli’s Milanese test track, to pit the two cars in a wintry drag race, brake test and timed laps of the circuit • xDRIVE: Ben Barry drove an all-wheel drive 330d Touring to Sölden in the Austrian Alps, home of the inaugural round of this winter’s Alpine Skiing giant slalom.

Toyoda says company is ‘grasping for salvation', fears big sales loss

Fri, 02 Oct 2009

Toyota Motor Corp. President Akio Toyoda said his money-losing automaker is “grasping for salvation” as it struggles to return to profit. The world's largest car company was once targeting annual sales of 10 million vehicles but now expects sales of 7.3 million this year, down from 8.97 million in 2008, Toyoda said today at a news conference.

BID TO SLOW TRAFFIC ON M3 STRETCH

Fri, 14 Feb 2014

FIRST it was a stretch of the M1 and now the same speed reduction plan has been announced for a stretch of the M3 motorway in Surrey and Hampshire. The Highways Agency (HA) has proposed that a three-mile section of the M3 between junction 3 at Lightwater in Surrey and junction 4 near Farnborough in Hampshire be subject to a 60mph restriction. This section is part of a 13.4-mile stretch that is being upgraded in a £174 million scheme, with the 60mph proposal, to operate between 7am and 7pm daily so air quality levels can be met.