Find or Sell any Parts for Your Vehicle in USA

Universal 4" Round Chrome Clear Lens Purple Halo H3 Bulbs Fog Lights Lamps Kit on 2040-parts.com

US $31.45
Location:

Walnut, California, US

Walnut, California, US
Returns Accepted:Returns Accepted Refund will be given as:Money Back Item must be returned within:30 Days Return shipping will be paid by:Buyer Restocking Fee:No Placement on Vehicle:Front Part#:4" Round Fog Light Driving Lights Bulbs:H3 Diameter:4" Halo:Purple Halo Angel Eye Rim Part Number:4-FL-3830-SWPU

Fog/Driving Lights for Sale

Lincoln opens first dedicated design studio for 40 years

Fri, 19 Oct 2012

Ford has opened the first dedicated Lincoln design center for 40 years in Dearborn, Michigan, as part of its ongoing brand reinvention. Last August Ford announced it would be creating the studio for its luxury brand as well as increasing spending, giving it unique interiors and powertrains in an effort to differentiate it from the core Ford offerings. The Lincoln Design Studio has been built on the campus of Ford's Product Development center and houses designers, sculptors, modelers and engineers who make up part of a larger Lincoln Product Development team that will create four new Lincoln vehicles by 2015.

Fiat will rebadge Dodge Journey in Europe

Mon, 27 Dec 2010

Chrysler Group will stop selling the Dodge Journey in Europe and will instead market the crossover with a Fiat badge, Fiat sources said. The Fiat version of the Journey will be called the Freemont, the sources said. The Freemont is a key part of Fiat-Chrysler CEO Sergio Marchionne's plan to cut development costs and boost capacity utilization at the automakers' factories by cross selling vehicles from Fiat group and Chrysler group brands.

Repair work to hit key road route

Tue, 24 Sep 2013

A KEY ROAD ROUTE into London will be affected by closures at some weekends next summer for the completion of repair work. The summer 2014 work will be on the Hammersmith Flyover on the A4 in west London. Before that, there will be night-time lane closures starting next month as the final phase of work to strengthen the flyover's 16 spans begins.