Find or Sell any Parts for Your Vehicle in USA

Used Mercury Mercruiser I R Lower Gearcase Assembly on 2040-parts.com

US $150.00
Location:

Saint Paul, Minnesota, US

Saint Paul, Minnesota, US
Item must be returned within:14 Days Refund will be given as:Money Back Return shipping will be paid by:Buyer Returns Accepted:Returns Accepted Return policy details: Restocking Fee:No Brand:Mercruiser Manufacturer Part Number:Case # 1623-5412

Used Mercruiser I / R drive Pre-Alpha Lower Gearcase Housing Assembly, off 1974 drive (Transom # 4426411).  Corrosion Visible, Skeg is partial.  Ideal for parts or rebuild project.  Unsure of Assembly Part Number, but Case # is 1623-5412.

BYD E6 – Next Gen Electric Car battery technology

Sun, 03 May 2009

Chinese car maker BYD are using revolutionary battery technology in the BYD E6 The biggest problem with electric cars (or one of them, at least) is that the battery technology is not really up to the ambitions of car makers. Chevrolet’s Volt (aka Opel Ampera) is a good case in point. Tellingly, a Toyota tecchy referred to the science behind the Chevvy Volt as ‘Vaporware’, and the whole project is founded on the expectation that the technolgy will develop quickly enough to make the car a reality.

VW Polo R Line (2012) first official pictures

Mon, 30 Apr 2012

Sportiness is not a word normally associated with the VW Polo. Even in GTI guise the current VW Polo is a rather sober driving experience compared to more exuberant rivals like the Renaulsport Clio or upcoming Ford Fiesta ST. There's nothing wrong with that, but with a WRC campaign on the horizon and a sensible-shoes donor car on its hands, Wolfsburg have created the Polo R Line.

No M4 relief road 'before 2020'

Thu, 07 Nov 2013

A "RELIEF ROAD" for the M4 in south Wales is unlikely to be constructed before 2020, a leading transport expert has told Welsh Assembly Members. A new stretch of motorway south of Newport could be back on the cards after the UK ministers announced the possibility of Welsh Government borrowing the money needed for the scheme. However the re-emergence of proposals to ease traffic on Wales' heavily congested western gateway prompted fierce debate during a committee hearing in the Senedd.