Used Yamaha Road Star Rear Cylinder Head Rocker Base Xv1600 Arms Tappet Shaft on 2040-parts.com
Laguna Hills, California, US
Components for Sale
- Used yamaha road star rear cylinder head valve cover xv1600 top roadstar(US $29.99)
- Used yamaha road star valve push rod xv1600 rods cam roadstar components(US $9.99)
- Used yamaha road star front middle mid valve cover spacer xv1600 roadstar(US $39.99)
- Used yamaha road star cylinder head bolts xv1600 bolt nut special roadstar(US $6.99)
- Used yamaha road star rear cylinder head assembly xv1600 cyl assy valves springs(US $199.99)
- Used yamaha road star transfer case middle gear xv1600 transmission oem sub(US $269.99)
2013 Dodge Charger AWD offers Sport package, paddle shifters
Tue, 18 Dec 2012Dodge will offer a new Sport package for the all-wheel-drive 2013 Charger sedan. It will be available on all trims except the SRT8, costing $1,395 on the SXT and SXT Plus models and $1,195 on R/T and R/T Plus versions. The Sport package includes a gloss-black grille and surround, 19-inch polished aluminum wheels, all-season performance tires, body-color spoiler and sport seats.
Cost of garage labour falling
Mon, 23 Sep 2013THE AVERAGE labour rate at both franchised and non-franchised garages has fallen compared to 2012, according to new figures. An annual survey of 12,000 cases conducted on behalf of Warranty Direct has concluded that the average labour rate in 2013 is £74.70, a fall of 9.84% from £82.86 in 2012. Less encouraging is the overall trend of rising labour rates, with the average having increased by 33% over the last ten years.
2013 New York F1 Grand Prix cancelled
Fri, 19 Oct 2012The 2013 Grand Prix of America in New Jersey has been dropped as organisers run out of time to prepare for the New York street F1 event. With Bernie Ecclestone pushing to get America to fall in love with F1, a headline F1 act on the streets of New York – a Monaco GP for the colonials – looked like a plan. But it’s a plan that’s now been postponed until at least 2014 after Bernie plugged the plug on organisers as they need more time to prepare for what will, by any measure, be a huge logistical task.