THIS IS A VINTAGE 1930-31 HUPMOBILE 8 HUB CAP. SOLD AS IS WITH NO RETURNS WINNING BIDDER MUST PAY WITHIN 48 HOURS OF AUCTION END.
THANKS FOR LOOKING................. |
Wheel Hubs & Bearings for Sale
- C/r oil seal #21120 - i.d. 2.125 " - o.d. 2.879" - width 0.375"(US $9.00)
- C/r oil seal 13630 - i.d. : 1.375" - o.d. : 2.11" - width : .312"(US $9.00)
- Big truck rear wheel seals #46210 - i.d. 4.625" - o.d. 5.756" - width 0.50"(US $35.00)
- C/r oil seal 13578 - i.d. : 1.375" - o.d. : 2.066" - width : .437"(US $9.00)
- C/r oil seal 7587 - i.d. : 75" - o.d. : 1.503" - width : .25"(US $9.00)
- C/r oil seal 15374 - i.d. : 1.521" - o.d. : 2.66" - width : .424"(US $9.00)
2015 Volkswagen Touareg price and specs – costs from £43,000
Fri, 15 Aug 2014The 2015 Volkswagen Touareg (pictured) costs from £35k Volkswagen revealed a facelift for its biggest SUV – the VW Touareg – at the Beijing Motor Show in April which got the usual tweaks of titivated front and back and a new set of alloys to make it look fresher. Also in the mix, sadly, was the end of the very grunty 4.2 litre V8 diesel (and the hybrid in the UK) with VW deciding to concentrate on two flavours of V6 diesel and adding in new technology like post-collision braking, coasting and low-resistance tyres with air suspension to the mix. Now, with the 2015 VW Touareg due to go on sale on 27 August, Volkswagen has revealed prices and specs for the new Touareg.
Mopar offers high-performance parts for 2013 SRT Viper
Wed, 31 Oct 2012Mopar is introducing a group of high-performance parts for the 2013 SRT Viper, which begins production next month. Braces, coil-overs, exhaust systems and more will be available when the first car rolls off the line. A performance cross car engine X-brace will cost $3,175.
Call for reform over road repair funding
Fri, 06 Jun 2014FUNDING patterns mean most road maintenance is being carried out in "less-efficient, cold and wet" times, a report from a Government spending watchdog has said. The current pattern of funding, combined with the need to spend money within the financial year, means that most maintenance work goes on between September and March, said the report from the National Audit Office (NAO). It went on: "Although this is less disruptive for road users, it is less efficient than carrying out the work at other times of year because materials can be more difficult to handle in cold and wet conditions, and daylight hours are shorter." The report went on: "As a result of the additional funding for emergency repairs, which is made available at the end of the financial year, almost all highways authorities need extra capacity from the market at the same time, which makes it less likely that they will get value for money." The NAO report said there was a "lack of predictability" over road spending adding that historically, local highway authorities spent more revenue on maintenance, but were now carrying out fewer routine activities such as clearing gullies which are essential to preventing water seeping into roads' sub-structure.