Find or Sell any Parts for Your Vehicle in USA

Vintage Car Window Cranks Lot Of 2 No 9715291 Gm on 2040-parts.com

Location:

Hanover, Pennsylvania, United States

Hanover, Pennsylvania, United States
Condition:Used Manufacturer Part Number:9715291 Placement on Vehicle:Left, Rear Warranty:No Surface Finish:Chrome Country/Region of Manufacture:Canada

Aston Martin V12 Zagato production debut in Kuwait

Fri, 27 Jan 2012

Aston Martin V12 Zagato production debut in Kuwait The production ready version of the Aston Martin V12 Zagato we first saw at Villa D’Este will be unveiled at the Kuwait Concours d’Elegance in February. Last spring saw the Aston Martin V12 Zagato –  spiritual successor to the Aston Martin DB4GT Zagato – arrive at Villa D’Este, looking every bit as good as you would expect an Aston Martin by Zagato to look. There were doubts expressed about whether the v12 Zagato would go in to production – at least publicly – but it was always clear that the V12 Zagato was Aston Martin['s next halo car, following on from the even more extreme (certainly cost-wise) Aston Martin One-77.

Spyker stretches the C8 Laviolette to make the Spyker C8 Aileron

Wed, 04 Mar 2009

But those problems faded last year when Spyker got solid investment from a Russian banker. Which means Spyker can once more push forward after a period of struggle, although what impact the crisis engulfing the car market in general will have is anybody’s guess. Spyker C8 Aileron - a stretched C8 Laviolette We had half expected the story at Geneva for Spyker to be the reveal of the Spyker SUV – the Spyker D12 Peking-Paris – in something close to production ready state.

Webinars: RTT Realtime Design & Engineering Reviews

Wed, 06 Apr 2011

Car Design News hosted Realtime Design & Engineering Reviews Using High-End 3D Visualizations with RTT on April 6, 2011. This particular webinar explored how Virtual Reality is becoming increasingly important in the product development process. Thanks to new visualization and simulation, technologies are minimizing dependence on physical prototypes, which in turn create massive cost and time savings.