Find or Sell any Parts for Your Vehicle in USA

Vintage K-d Lamp Co 866 Fog Light & Mounting Bracket Hot Rat Rod Harley Chopper on 2040-parts.com

Location:

Milwaukee, Wisconsin, United States

Milwaukee, Wisconsin, United States
Condition:Used Brand:K-D Lamp Co Surface Finish:Painted Metal Manufacturer Part Number:866 Warranty:No Placement on Vehicle:Left, Right, Front Country/Region of Manufacture:United States

Here we have a Vintage K-D Lamp Co., Fog Light. Model 866. Measures 6" Across the Front. A Very Solid Bucket with No Dents, and Good Glass. Some rust to back and trim.

Lexus LF-CC concept car (2012) first official pictures

Mon, 17 Sep 2012

It’s taken some time, but Lexus lovers will be delighted to learn of the new slender LF-CC concept unveiled at the Paris motor show this week, which looks set to replace the current IS range. The LF-CC concept sports a sleek coupe-style body, suggesting its latest family saloon could be a real head-turner. For the first time ever, the IS will be available with the all-new 2.5-litre full hybrid engine, which is soon to be fully incorporated into the Lexus model range.

Jaguar XF Estate on the way

Sun, 22 Mar 2009

Jaguar XF Estate - Expected to show as a Concept at the Frankfurt Motor Show in September Jaguar doesn’t have the best history on estate cars (the X-Type Estate, although a reasonable car – and 4WD – was just a Mondeo with smart clothes) but the Jaguar XF is such a triumph for Jaguar that I’m sure we’ll see the XF Estate taking the fight to the Germans in a big way. It’s reasonable to expect the standard engines and trim versions to carry over to the Estate, but apparently so will the mighty XFR trim. Which means we will see a Jaguar Estate car which will be able to take on the likes of the M5 Estate, the E63 AMG Estate and the RS6 Estate.

July 9: Keeping it topped off

Fri, 09 Jul 2010

As expected, when I walked back to my parking space at VSP parking across the street from Burbank Airport the i-MiEV was fully charged. No problem. It had more than 24 hours to get charged and it can't take more than 16 hours to do it, if you figure one hour per kWh at 120 volts.