Vintage Nos Ford Car Patch From The 70's 021 Comet Caliente on 2040-parts.com
Dundalk, Maryland, United States
Powered by eBay Turbo Lister The free listing tool. List your items fast and easy and manage your active items. |
Patches for Sale
- Vintage nos ford car patch from the 70's 023 maverick(US $19.99)
- Vintage nos ford car patch from the 70's 025 boss(US $19.99)
- New chevrolet certified technician cct journeyman patch(US $5.00)
- Vintage lot ontario motor speedway racing patch california 500 indy raceway(US $15.99)
- Vintage daytona nascar 500 souvenir patch sew 2.75" by 1.75"(US $4.99)
- Vintage nos ford car patch from the 70's 034 english line(US $9.99)
Porsche 911 GT3s to be given new engines after fire issue
Tue, 18 Mar 2014The Porsche 911 GT3 (pictured) is getting a new engine Last month, after two new Porsche 911 GT3s caught fire, Porsche stopped delivering new 911 GT3s to owners, halted production and advised owners not to drive their new pride and joy. But now Porsche say they have discovered the cause of the issue and have a fix – a new engine. The fault that caused the fires is as simple as faulty connecting rod fasteners which damaged the crankcase, so Porsche is in the process of building new engines for all 785 GT3s already made with new connecting rod fasteners.
2012 Lotus Exige V6 Spied
Sun, 07 Aug 20112012 Lotus Exige V6 Spied We’ve reported, sometimes cynically, on Dany Bahar’s plans for Lotus. And some do seem to be a bit less than credible, certainly when you factor in cost. But the spy shot we have of a 2012 Lotus Exige V6 sporting a more grown-up look – and the Evora’s V6 engine – show Lotus to be serious about its upmarket direction.
Mercedes A Class production outsourced
Tue, 24 Jul 2012Mercedes is outsourcing some new A Class production as orders continue to flood in for Mercedes’ new compact car. Last week we had the news that Mercedes will be building new A Class compact SUV – the Mercedes GLA – at the Mercedes plant in Rastatt as production of the A Class kicked off. But despite the new A Class being built at both Rastatt and the Mercedes plant in Kecskemet, Hungary, Mercedes don’t have enough capacity for the volume of order flooding in for the new A Class – over 40,000 since it went on sale just over a month ago.