Find or Sell any Parts for Your Vehicle in USA

Vision-oe 731-2245 Steering Pump-power Steering Pump on 2040-parts.com

US $83.70
Location:

Salt Lake City, Utah, US

Salt Lake City, Utah, US
Returns Accepted:Returns Accepted Refund will be given as:Money Back Item must be returned within:14 Days Return policy details:Items must be returned in original packaging in salable condition. Any item that has been installed can not be returned. Refunds will be issued once the merchandise is received. Return shipping will be paid by:Buyer Restocking Fee:No Core Charge:$25.00 Which is included in the total price Part Brand:VISION-OE Manufacturer Part Number:731-2245 SME:_3271

Spring Mountain opens Cadillac V-Series Academy

Tue, 29 Jan 2013

While half the country is slogging through snow this time of year, some of you -- like Cadillac -- are prepping for the racetrack. The Cadillac V-Series Academy at Nevada’s Spring Mountain Resort and Country Club is now open to the public. The resort, just outside Las Vegas, has four miles of racetrack and 125 feet of elevation change.

Top Gear Series 19: Video trailer & 1st episode details

Sat, 19 Jan 2013

Series 19 of Top Gear returns to BBC 2 on 27th January, and we have a video trailer and details of the first episode. It’s been a bit odd without Top Gear on our screens (well, new Top Gear episodes), but normal service will resume on 27th January as series 19 of Top Gear returns to BBC2. Ahead of the first episode of series 19 (there will be seven episodes in total), the Beeb is making sure we know there’s a new Top Gear series coming with a short video trailer, and the BBC has also sent us details of the first episode.

KISKA opens new design studio

Thu, 19 Mar 2009

Austrian brand management and design company KISKA has moved its design studio into a modern new building in Salzburg, Austria, just a few meters from its former location. The new headquarters boasts state-of-the-art workstations and has been built to enable the firm to prepare for expansion and new challenges in the years to come. Designed by Hofbauer architects, the 4700m² building was built in just one and a half years.