Other for Sale
Land rover oem wcl500030 exhaust clamp/exhaust system parts(US $52.00)
Summit racing exhaust cutout 670135(US $39.92)
Arp header bolts hex head 5/16" wrench stainless polished 3/8"-16 1.000" u.h.l.(US $49.41)
Walker 31332 exhaust flange gasket donut flat style 1 31/32" i.d hole 1/8" thick(US $3.97)
Vibrant performance exhaust flange gasket 1457(US $4.05)
Walker/pro-fit 31372 gasket(US $7.97)
Volvo V40 Review: D3 SE Nav (2012)
Sun, 11 Nov 2012This week we have Volvo’s very promising new V40 in for review and test in the guise of the V40 D3 SE Nav manual. For perhaps the first time, Volvo are offering a serious alternative to cars like the BMW 1 Series (and the new Mercedes A Class) with the V40. Certainly on all the things that grab the headlines – looks, performance and equipment – the V40 seems to be a very credible effort from Volvo.
Maserati Levante SUV confirmed for 2015 – Alfieri could arrive in 2016
Fri, 07 Mar 2014The Maserati Levante SUV (pictured) will arrive in 2015 Fiat’s plans top revive the Maserati brand are off to a good start after sales grew strongly last year to more than 22,500 cars in the first nine months with the new Quattroporte and new Ghibli contributing strongly to those figures. But with a target of 50,000 sales a year, Maserati need new models too and the next in line for production is the Maserati Levante SUV, which Sergio Marchionne has now confirmed will arrive in production guise in 2015. It was expected the Levante would be a re-working of the new Jeep Grand Cherokee, but with the Grand Cherokee selling in droves – and with a desire to make the Levante as ‘Italian’ as possible – it now looks like the Levante will get a version of the platform underpinning the Ghibli and use Maserati’s own 4WD system.
BID TO SLOW TRAFFIC ON M3 STRETCH
Fri, 14 Feb 2014FIRST it was a stretch of the M1 and now the same speed reduction plan has been announced for a stretch of the M3 motorway in Surrey and Hampshire. The Highways Agency (HA) has proposed that a three-mile section of the M3 between junction 3 at Lightwater in Surrey and junction 4 near Farnborough in Hampshire be subject to a 60mph restriction. This section is part of a 13.4-mile stretch that is being upgraded in a £174 million scheme, with the 60mph proposal, to operate between 7am and 7pm daily so air quality levels can be met.