Wd Express 703 33023 103 Starter on 2040-parts.com
Deerfield Beach, Florida, US
Starters for Sale
- 99 00 01 02 03 04 05 vw passat 2.8l v6 starter motor(US $50.00)
- Starter vw jetta beetle rabbit 05-09 2.5l l5 at new(US $125.99)
- Bbb industries 17996 starter-reman starter(US $263.01)
- Bmw oem 12412344242 starter(US $389.24)
- 00 01 02 03 04 05 nissan sentra starter motor 1.8l thru 12/04(US $45.00)
- Mpa 16774 remanufactured starter(US $61.08)
BMW M4 coupe (2014) first official pictures
Wed, 11 Dec 2013By Damion Smy First Official Pictures 11 December 2013 12:00 June 21 2014 is the day the new BMW M4 goes on sale, yet BMW has released full details for the production version of its new hero ahead of its Detroit show debut in January. In case you missed it, the M4 is the new name for the two-door M3, and the flagship M version is more powerful, faster and tougher than ever. The outgoing M3 Coupe has proved the benchmark for the Mercedes C63 AMG and the Audi RS5 so the M4 will has its work cut out for it, having to live up to not only its rivals, but its predecessor.
Toyota revamps Yaris line-up for 2014
Wed, 04 Dec 2013Toyota has revamped its Yaris line-up and announced that the 1.4-litre diesel now has lower emissions – meaning it gets free road tax. The Yaris will now also come in a choice of four new trim levels: Active, Icon, Icon Plus and Trend. The Active and Icon replace the T2 and Tr, while Trend becomes the new top-of-the-range model.
SAE approves new fast-charging standard for EVs, plug-ins
Tue, 16 Oct 2012SAE International said it has approved a new technical standard that will dramatically reduce charging times for plug-in hybrid electric vehicles and electric vehicles. The global engineering group said the new charging standard, developed with the cooperation of more than 190 automakers, utilities and equipment builders, will allow charging times to be reduced from as long as eight hours to as short as 20 minutes. Automakers want DC direct charging to take less than 10 minutes, or roughly the time it takes to fill a tank with gasoline.The goal is to accommodate currents as high as 500 volts distributed from public charging stations.