Yamaha 1979 Xs1100 Xs1100f Xs11 Xs Original Oem Mirrors *free Shipping* on 2040-parts.com
Pompton Lakes, New Jersey, United States
Handle Bars, Levers, Mirrors for Sale
- Factory effex 10 in cross bar pad metal mulisha black red 14-66952 new in stock(US $14.95)
- Honda vt750cd2 1998-2001 voltage regulator/rectifier(US $75.29)
- Polaris sportsman 500 ho 2001 2002 2003 2004 2005 2006 starter clutch drive
- Harley sportster 1991 thru 2003 1200/883 chrome flame clutch cover inspect
- Viper ii black rearview mirrors m10 metric & 5/16" for bobber - amm shop(US $119.90)
- Harley 14 inch gorilla black cables/brake line/wiring kit 2007-12 fxdwg(US $157.70)
New 2014 Mercedes S-Class order book opens – price from £62,650
Wed, 26 Jun 2013The New Mercedes S-Class (pictured) costs from £62,650 The all new Mercedes S-Class was officially revealed last month, and went in to production last week, and now the order book opens for Mercedes new technological tour de force in the UK. At launch you’ll have a choice of three engine options – diesel, hybrid and V8 petrol – and a choice of standard wheelbase or long wheelbase (which adds £3,000) with the cheapest model being the S 350 BlueTEC. The S350 BlueTEC SE gets the 3.0 litre Mercedes diesel V6 with 255bhp and 146g/km emissions and the promise of 51.4mpg, with the AMG Line models getting the same engine but costing from £67,685.
Car makers shun Detroit show NAIAS 2009
Thu, 27 Nov 2008By Simon Stiel Motor Shows 27 November 2008 11:28 The number of car makers pulling out of Detroit's major auto show, the North American International Auto Show 2009, is growing. The very survival of Detroit is being questioned as Congress debates the $25 billion aid package to save GM, Ford and Chrysler – and now it looks as if the NAIAS is under threat too. In the past weeks, Ferrari, Land Rover, Rolls Royce, Mitsubishi, Nissan and Suzuki have announced their withdrawal from the show, which is scheduled to begin on 11 January 2009.
Detroit Electric delays SP:01 EV
Mon, 03 Jun 2013Detroit Electric will delay the SP:01 EV roadster for at least a month, according to a company executive who talked to the Detroit News. The company still hasn’t finalized a manufacturing location in Wayne County. Production was scheduled to start in August, now it’s slated for September.