Yamaha 66e 800 Crank Cases Gp Gpr Xl Xlt Gp800 Xl800 Block Crankcase Nr on 2040-parts.com
La Porte, Texas, United States
This is a matching 66E 800 crankcase set from a GP800, These will work on all 800 yamaha's. They are in very good condition. And comes with the bedplates and hardware. Shipping will be $18 to anywhere in the USA and actual cost to anywhere else in the world. And if you win more than one of my auctions I will ship them together and charge actual shipping costs, saving you money.
|
Complete Engines (Watercraft) for Sale
- Yamaha 66e 800 cylinder+piston jug gp gpr xl xlt gp800r powervalve topend nr
- Yamaha 66e 800 crankshaft gp gpr xl xlt gp800 gp800r xl800 crank shaft
- Yamaha 62t/64x crank cases wave raider blaster superjet xl 760/701 venture nr
- Polaris virage di crankcase and crank for 800 pwc(US $450.00)
- Tigershark teeth full 1 inch(US $30.00)
- Tigershark teeth 5/8 nch(US $27.00)
Coventry University MA Degree Show 2008
Fri, 09 Jan 2009Coventry University's School of Art and Design recently held an exhibition at the Coventry Transport Museum for the 18 students graduating from its MA Automotive Design course. The projects consisted of a number of innovative and exploratory concepts, almost half of which, interestingly, were presented in digital form. Here are the highlights of the exhibition: iMo Anthony Jannarelly We first saw Anthony's work when he was an undergraduate at Coventry, and the Frenchman continues to impress with his latest MA project, the iMo.
Rolls Royce for the People – China’s Geely builds a RR Phantom
Tue, 31 Mar 2009The Geely GE - A Chinese Rolls Royce! Plagiarised cars are not new. China has been making them for years (to the ongoing consternation of Western car makers), and Mitsuoka in Japan make a whole range of cars that ‘pay homage’ to classic cars of the past.
Green Light For More Smart Motorway Schemes
Wed, 09 Jul 2014THE Government has announced plans to speed up journey times on selected parts of the nation’s motorway network. As a result, work will start to convert the hard shoulder into a running lane on two sections of the M1 and on a stretch of the M3. The M1 work will be between junctions 28 and 31 in Derbyshire and between junctions 32 and 35a in South Yorkshire, with claims that it will boost capacity by up to a third and improve journey times by up to 10%.