Yamaha Gp7-u7833-11-00 Gp7-u7833-11-00 Socket on 2040-parts.com
Albany, Georgia, United States
Electrical Systems for Sale
- Yamaha 65l-11396-00-00 gasket, holder(US $5.97)
- Yamaha 60v-85544-00-00 case(US $9.86)
- Mercury outboard distributor rotor shaft * new * part # 3269a1 3269a1(AU $75.00)
- Mercury mariner outboard voltage regulator rectifier 815279 883072t new(US $28.99)
- Yamaha outboard c.d.i cd.i c.di cdi coil unit electric 4 5 4hp 5hp (6e0-85540)(US $35.00)
- 1976 chrysler 3-cyl 75hp 757hb internal wire harness f438744-1 motor outboard(US $18.99)
Art Center and Clemson University students unveil Mazda Deep Orange 3 concept
Wed, 07 Aug 2013Art Center College of Design and Clemson University students joined forces to design and develop a next-generation Mazda concept, the Deep Orange 3. The Deep Orange 3, which features a body designed by Art Center student Frederick Naaman, has been unveiled at the Center for Automotive Research Management's Briefing Seminars in Ann Arbor, Michigan. The project started with market research focusing on what kind of car Generation Y would want to drive, with the results showing that the majority wanted five or more seats.
VW Golf Match (2010) launches
Thu, 20 May 2010The new VW Golf Match At least the Volkswagen Golf Match makes sensible use of the pun, unlike the VW Touran Match we got last summer or the Tiguan Match that turned up a couple of weeks ago. And it looks like VW are intent on wiping out the SE trim across their range and replacing it with the ‘Match Moniker’. This is much the same deal as we had with the Tiguan Match.
Seat completes industry's largest solar panel installation
Mon, 25 Nov 2013SEAT HAS completed construction of the largest solar panel installation in the automotive industry. The huge 'Seat al Sol' array at the firm’s Martorell plant outside Barcelona is the size of 40 football pitches and generates 15 million kilowatt hours of power per year courtesy of the reliable Spanish sunshine. The electricity produced is enough to account for a quarter of the amount needed to build a year’s allocation of Leons, reducing the factory’s energy bills significantly and saving 7,000 tonnes of CO2 per year.