Yamaha Xt250 Xt500 Dt250 Dt360 Dt400 Rear Footrest Foot Pegs Set L/r (mi) on 2040-parts.com
Bangkok, Bangkok, Thailand
Pedals & Pegs for Sale
- Legends forward controls(US $325.00)
- Ims gear shift pedal honda cr 500 cr500 89-01 _
- Yamaha yzf r6 2006-2007 & r1 2002-2008 black mirrors(US $12.95)
- Lindby twinbar front highway bar chrome (1201)(US $449.95)
- New aluminum footpegs foot pegs for harley softail dyna electra glide sportster
- Grom msx125 2013-15 adjustable rear set kitaco #516-1432100(US $200.00)
Who's Where: Peter Jones appointed Lincoln Interior Design Manager
Fri, 01 Jun 2012Lincoln has appointed Peter Jones as the luxury brand's new interior design manager, a role he will take up within the next few weeks. Jones, who has worked at Ford Australia's design studio for seven years, will report directly to Max Wolff, a former colleague who moved in January 2011 to become Lincoln's Design Director. The Australian designer was interior design manager for the new Ranger and also worked as lead exterior designer on the FG Falcon Ute.
Vauxhall Monza concept (2013) the new high-tech coupe revealed
Wed, 21 Aug 2013Vauxhall will unveil its new Monza coupe concept at the Frankfurt motor show in September 2013, exactly 36 years after the original Monza was revealed at the very same event. This sleek new Vauxhall isn’t a retro throwback though – it sports a cutting-edge gas/electric powertrain that promises to be even more frugal than Vauxhall’s own 235mpg Ampera. So the new Monza shows the future of Vauxhall, does it?
Better Place EV Battery Swap business goes bust
Tue, 28 May 2013It seemed like a good idea: take the cost of batteries out of the cost of buying an electric car and instead charge EV owners to use ‘Battery Swap’ stations where depleted batteries could be swapped for fully charged ones in the time it takes to fill an ICE car with petrol. But it’s all gone a bit Pete Tong. Better Place – which partnered with Renault in 2009 to make the battery swap technology viable – has failed to find anyone to add to the $750 million already involved in the project and has filed for bankruptcy.