Find or Sell any Parts for Your Vehicle in USA

Chiltons Chrysler 1993-1997 Repair Manuel on 2040-parts.com

US $2.49
Location:

Hayward, Wisconsin, United States

Hayward, Wisconsin, United States
In good order.
Brand:Chrysler

London motor show A-Z report and videos

Thu, 24 Jul 2008

By Tim Pollard Motor Shows 24 July 2008 17:30 CAR Online now has a full A-Z multimedia guide to the London motor show 2008. Check out our full reports from every stand at the British International Motor Show, complete with: • A written stand review by CAR journalists • Video of the key cars at the London show • Separate video news stand-by-stand • Reader reports by CAR's citizen journalists Scroll to the foot of each manufacturer report for exclusive CAR video reports – and be sure to click 'Add your comment' to rate our news and our readers' reviews of the British International Motor Show. Do we have some star writers in the making?

2015 Volkswagen Jetta facelift price & specs – costs from £18,815

Tue, 12 Aug 2014

The facelifted VW Jetta is now on sale in the UK The Volkswagen Jetta – a VW Golf with a boot – is getting a bit of a facelift for 2015 (although you’d be hard-pushed to see the changes) and now, after its reveal at the New York Motor Show in April, it’s going on sale in the UK. Although the cosmetic changes to the Jetta are minor – the usual tweaks to the back and front, including a revised grill – VW claim the small changes it’s made result in a Jetta that’s ten per cent more aerodynamic (which makes you wonder why they didn’t do it earlier). The visual changes inside are just as minor, with a new steering wheel, new trims and new fabric options, with ambient lighting fitted to the Jetta GT.

Jaguar Land Rover installs UK's largest solar roof

Tue, 08 Apr 2014

THE LARGEST EVER solar panel roof has been completed at the Jaguar Land Rover (JLR) engine factory in South Staffordshire. More than 21,000 solar cells have been fitted to the roof over the Engine Manufacturing Centre and will provide enough electricity to power 30% of the factory’s needs. When the solar panels are working at full capacity, they will generate enough energy to power the equivalent of 1600 homes.